Galofer CHP with Rice Husks
#189of 352 in Biomass#12of 15 in Uruguay#1200of 1459 in CDM (UNFCCC)
Audit Analysis
The Galofer CHP rice-husk project in Uruguay has VVB-confirmed additionality and a documented monitoring framework, but suffers from a critical over-crediting signal: the verified two-year emission reduction (73,174 tCO₂e) exceeds the PDD's entire lifetime ex-ante estimate (65,432 tCO₂e). Numerous material findings and corrective actions in the verification report indicate significant data-quality issues, and the absence of a buffer pool, feedstock sustainability verification, and a consistent leakage treatment further weaken the project's integrity profile.
Red Flags
- Verified two-year ERR of 73,174 tCO₂e exceeds the PDD lifetime ex-ante estimate of 65,432 tCO₂e, representing approximately 425% of the pro-rata expectation for the elapsed monitoring period
- Monitoring report self-reported ERR of 127,497 tCO₂e is nearly double the PDD lifetime estimate, indicating a major discrepancy in project-level calculations
- Leakage justification is contradictory: the verification report states 'quantified' while the monitoring report states 'deemed negligible', yet the deduction is 0% in both cases
- No buffer pool or permanence mechanism documented for a biomass project with inherent reversal risk
- 18 material findings and 10+ corrective actions in the verification report, including errors in methane calculations, emission factors, and baseline scenario handling
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 73,174 | 0 | 73,174 | |
| Total | 73,174 | 0 | 73,174 |
Risk Indicators
VVB-confirmed combined test
reversal risk unaddressed
0% deduction; contradictory justifications
Project-specific, modeled; no reassessment data
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →