Grid emission factor: the methodology sets rules for it (AM0029 v03 baseline emissions, p. 5). CarbonMeld reads it in the project's documents. CM-F-AM0029-GRID-EF
AM0029 — Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas
About this methodology
Projects build natural gas power plants that supply the grid. The method compares their emissions with the electricity supply that would otherwise meet demand.
- Issued by
- CDM (UNFCCC) · issuer's site
- Last published version
- 3.0 · source ·
- Status
- Withdrawn at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (21 projects)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Deductions that can apply
No additionality test in the documents (renewable energy) A-TEST-NOT-STATED
Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (AM0029 v03, p. 6). Our current method does not assess it. CM-F-AM0029-LEAKAGE
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases (AM0029 v03 applicability, p. 1). Our current method does not assess it. CM-F-AM0029-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0029-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Replaced by ACM0025
withdrawn at CDM Executive Board meeting 83 · ACM0025 version 01.0 of 16 Apr 2015
AM0029 | Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas --- Version 3.0 | ACM0025 | EB 83
-
v03adopted 16 May 2008source
Flexibility to choose the most appropriate financial indicator to be used in the analysis for the identification of the baseline scenario; To clarify that the 1% threshold to characterize small amounts of other start-up or auxiliary fuels …
-
v02adopted 19 Oct 2007source
Incorporate the use of the “Tool to calculate emission factor for an electricity system”
-
v01adopted 12 May 2006source
Initial adoption
Projects using AM0029
Browse 132 published projects using AM0029, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0029?
In CarbonMeld's data, AM0029 projects are on 2 registries: CDM (111) and Verra (21). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 111 | 59 | See the list |
| Verra (VCS) | 21 | 6 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
22 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages give the reason and how many negative facts were found; the analysis is in Premium.
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Expansion of Natural Gas Based Combined Cycle Power Project from 225 MW to 450 MW by adding Phase IIAnalysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Not registered
- Analysis: No public grade applies yet
- Natural Gas Engine based Combined Cycle power project, Valuthur Village, Ramanathapuram, Tamil Nadu.Analysis: Not registered
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending