AM0029 — Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas

About this methodology

Projects build natural gas power plants that supply the grid. The method compares their emissions with the electricity supply that would otherwise meet demand.

Last published version
3.0 · source ·
Status
Withdrawn at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Electricity
Official page
cdm.unfccc.int ·
Also used by projects of

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it (AM0029 v03 baseline emissions, p. 5). CarbonMeld reads it in the project's documents. CM-F-AM0029-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Deductions that can apply

  • No additionality test in the documents (renewable energy) A-TEST-NOT-STATED

    Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Leakage: the methodology sets rules for it (AM0029 v03, p. 6). Our current method does not assess it. CM-F-AM0029-LEAKAGE

    Link
  • not assessed

    Sustainability of the feedstock: the methodology sets rules for it in some cases (AM0029 v03 applicability, p. 1). Our current method does not assess it. CM-F-AM0029-FEEDSTOCK-SUSTAINABILITY

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0029-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v03adopted 16 May 2008source

    Flexibility to choose the most appropriate financial indicator to be used in the analysis for the identification of the baseline scenario; To clarify that the 1% threshold to characterize small amounts of other start-up or auxiliary fuels …

  • v02adopted 19 Oct 2007source

    Incorporate the use of the “Tool to calculate emission factor for an electricity system”

  • v01adopted 12 May 2006source

    Initial adoption

Projects using AM0029

Browse 132 published projects using AM0029, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AM0029?

In CarbonMeld's data, AM0029 projects are on 2 registries: CDM (111) and Verra (21). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)11159See the list
Verra (VCS)216See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

22 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages give the reason and how many negative facts were found; the analysis is in Premium.

← All leaderboards · Full database