Combined Cycle Natural Gas Based Grid Connected Power Plant At Jegurupadu, India

VCS-982 ↗

6.4 / 10
Integrity
6.2
Transparency
6.0
Claim Safety
6.4
Documentation
7.4

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.

missing Baseline is project-specific and the timing of any baseline reassessment was not found in the extracted record.

Transparency

verified The monitoring period (2009-04-14 to 2011-04-13) and verified ERs (1,407,860) are clearly stated in the monitoring/issuance record.

missing Key MRV inputs (grid emission factor and year, and the project’s claimed ERs) were not found in the extracted record, reducing auditability.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk.

missing Over-crediting risk cannot be well screened because the grid emission factor and leakage deduction percentage were not found in the extracted record.

Documentation

verified Multiple core documents are available (PDD, validation report, monitoring report, issuance) with high extraction confidence and no corrective actions reported.

missing Safeguards reporting is inconsistent between documents, indicating a documentation quality/control issue.

Detailed Analysis

Integrity

The validation/verification record indicates additionality was confirmed by the VVB using an investment test (validation/verification documentation referenced in the extracted record). The baseline approach is project-specific (PDD/monitoring documentation), and the timing of any baseline reassessment was not found in the extracted record, which weakens confidence in baseline continued appropriateness. Leakage is described as quantified (monitoring report), but the actual leakage deduction percentage was not found in the extracted record, creating uncertainty about whether deductions were correctly applied.

Transparency

The monitoring report (dated 2013-06-19) clearly states the monitoring period (2009-04-14 to 2011-04-13), and the issuance/verification record provides verified emission reductions of 1,407,860. However, the total emission reductions claimed were not found in the extracted record, limiting the ability to reconcile claimed vs verified values. Key parameters that typically enable replication (grid emission factor and the year of the grid EF) were also not found in the extracted record.

Claim Safety

The project is explicitly marked as not CORSIA-eligible, which reduces the risk of higher-stakes aviation claims being made from these credits. Nonetheless, over-crediting risk screening is constrained because the grid emission factor (and its vintage) was not found in the extracted record, and the leakage deduction percentage is also missing despite leakage being described as quantified in the monitoring report. CCP status was not found in the extracted record, leaving uncertainty about how the credits might be marketed under newer integrity labels.

Documentation

The extracted record shows a reasonably complete document set (monitoring report, validation report, PDD, and issuance) and a high minimum extraction confidence, supporting a stronger documentation score. The monitoring report shows no material findings and no corrective actions required, which supports document quality and audit outcomes. However, safeguards information is inconsistent between the PDD and the monitoring report, indicating a documentation control issue for non-carbon aspects.

Overall

Overall quality is moderate: additionality is VVB-confirmed and the verification/issuance outcome appears clean (no material findings or corrective actions), but several quantifications needed to independently assess crediting conservativeness were not found in the extracted record (claimed ERs, grid EF details, leakage deduction percentage). The safeguards contradiction is material for transparency and reputational risk: the PDD (2011-03-31) indicates safeguards were mentioned, while the monitoring report (2013-06-19) indicates they were not. I privilege the later monitoring report for what was actually reported during implementation, but I score down documentation/transparency because the inconsistency suggests unreliable or incomplete safeguards disclosure across the project’s document set.

Audit Analysis

The project has a reasonably solid integrity case for a VCS grid-connected power project, with additionality confirmed by the VVB and no material findings or corrective actions reported. However, key quantifications that affect crediting risk (notably the claimed ERs, leakage deduction percentage, and grid emission factor details) were not found in the extracted record, and safeguards information is inconsistent across documents.

Project Description

This project involves building and running a 228 MW natural gas power plant, with the electricity produced being sent to the southern grid. Its operation will lead to a reduction in the southern grid's carbon intensity and power shortage.

Red Flags

  • Safeguards disclosure is contradictory between the PDD and the monitoring report, raising reliability concerns for social/environmental risk reporting.
  • Leakage is described as quantified, but the actual leakage deduction percentage was not found in the extracted record.
  • The total emission reductions claimed were not found in the extracted record, limiting cross-checking against the verified figure.

Credit Vintages

Issued Retired Available
2009
588,758 513,754 75,004
2010
688,619 671,751 16,868
2011
152,451 132,751 19,700
Total 1,429,828 1,318,256 111,572

Cosa migliorerebbe questo punteggio

  • Disclose the full baseline parameter set used for ER calculation (grid emission factor value, year/vintage, and data sources) and provide a clear reconciliation of claimed vs verified ERs for the monitoring period.
  • Provide consistent safeguards documentation across the PDD and monitoring/verification records (e.g., stakeholder consultation evidence, grievance mechanism, and any environmental/social management measures).

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal risk typical for grid power

Leakage

Quantified but % not provided

Baseline

Project-specific baseline; reassessment unclear

Safeguards

Safeguards not evidenced; inconsistent reporting

Double-claim

Not CORSIA-eligible

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti