Afam Combined Cycle Gas Turbine Power Project
#342of 1329 in Industrial#9of 79 in Nigeria#647of 1459 in CDM (UNFCCC)#11of 19 in AM0029
Audit Analysis
The Afam Combined Cycle Gas Turbine project is a well-understood fossil-fuel-switch CDM project verified by SGS United Kingdom, with VVB-confirmed additionality and no reported reversal events. However, six corrective actions were required to address gaps in baseline documentation, additionality evidence, and emission-factor determination, and the grid emission factor dates from 2009, introducing uncertainty into the baseline. The 19% gap between the project proponent's self-reported and the VVB-verified emission reductions, combined with a project-specific baseline, warrants caution.
Red Flags
- Six corrective actions (CARs) were required covering baseline grid boundaries, additionality evidence, investment-analysis values, sensitivity analysis, common-practice analysis, and EFBl determination — indicating substantial gaps in the initial PDD/validation documentation.
- The grid emission factor of 0.511 tCO2e/MWh is drawn from 2009 data; no updated or reassessed baseline emission factor is found in the extracted record, raising the risk that the baseline over- or under-states actual grid emissions.
- A 19% discrepancy between the project proponent's self-reported emission reductions (671,550 tCO2e) and the VVB-verified figure (541,537 tCO2e) was identified and resolved through CAR05, signalling that the initial monitoring data required material adjustment.
- The baseline method is described as 'project-specific' in the verification report but 'jurisdictional' in the validation report — an unresolved contradiction that affects baseline robustness.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 541,537 | 0 | 541,537 | |
| Total | 541,537 | 0 | 541,537 |
Risk Indicators
VVB-verified investment test, but six CARs on additionality
Fossil-fuel-switch project with no reported reversal events;
0% deduction deemed negligible; reasonable for a stationary
Project-specific baseline with a 2009 grid EF; CARs on grid
FPIC conducted, grievance mechanism in place, safeguards and
CORSIA eligibility and CCP status not explicitly stated in t
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →