Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

ACM0025 — Construction of a new natural gas power plant

About this methodology

Projects build gas power plants; the method compares their emissions with the electricity supplies they replace.

Version
2.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Electricity
Official page
cdm.unfccc.int ·

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-ACM0025-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Deductions that can apply

  • No additionality test in the documents (renewable energy) A-TEST-NOT-STATED

    Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Leakage: the methodology sets rules for it (ACM0025 para 36, p. 10). Our current method does not assess it. CM-F-ACM0025-LEAKAGE

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0025-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

  • v02.0adopted 22 Jul 2016source

    Include the requirements of TOOL05 and TOOL08.

  • v01.0adopted 16 Apr 2015source

    Initial adoption.

Projects using ACM0025

Browse 3 published projects using ACM0025, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under ACM0025?

In CarbonMeld's data, ACM0025 projects are on one registry: CDM (3 projects, 3 registered).

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)33See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (13 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.

← All leaderboards · Full database