Huadian Guangzhou Higher Education Mega Center LNG-fired Power Generation Project in China
#74of 1329 in Industrial#156of 1084 in China#252of 1459 in CDM (UNFCCC)#4of 19 in AM0029
Audit Analysis
A CDM fossil-fuel-switch project (LNG replacing coal) with VVB-confirmed additionality and a quantified leakage treatment, but significant documentation gaps including no verified ERR figure, no stated leakage percentage, and four cross-document contradictions. The project over-delivered relative to its pro-rata ex-ante expectation, and no reversal or double-claiming risks were identified, but the absence of a verified monitoring figure and the grid emission factor discrepancy limit confidence in the reported results.
Red Flags
- Grid emission factor differs between the validation report (0.5772) and the monitoring report (0.4506), creating uncertainty about which value underpins the ER calculation
- Total ERR claimed in the monitoring report (27,912) and the ex-ante lifetime estimate in the validation report (173,763) are on different bases, and no verified ERR figure is available to confirm actual delivery
- Baseline method is described as 'project' in the monitoring report but 'jurisdictional' in the PDD, creating ambiguity about the baseline construction
- Leakage is described as quantified but the actual deduction percentage is not stated in any available document
- Six material findings and seven corrective actions were raised during validation, including missing DNA approval letters and calculation errors in LCOE and IRR
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 28,610 | 0 | 28,610 | |
| Total | 28,610 | 0 | 28,610 |
Risk Indicators
VVB-confirmed combined test
Built plant, no reversal events
Quantified but % not stated
Method contradiction across docs
Mentioned but details absent
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →