Grid connected electricity generation using natural gas by the Vemagiri Power Generation Ltd.
#633of 1329 in Industrial#610of 975 in India#895of 1459 in CDM (UNFCCC)#13of 19 in AM0029
Audit Analysis
A CDM fossil-fuel-switch project (natural gas replacing coal) with a confirmed combined additionality test and jurisdictional grid baseline, but undermined by 15 material findings and 15 corrective actions that expose significant PDD inaccuracies and monitoring-plan deficiencies. The verified ERR of 99,002 tCO₂e for the 2013–2016 period represents roughly 63% of the pro-rata lifetime expectation, suggesting conservative crediting, yet the internal contradiction in claimed ERR figures within the same monitoring report raises data-reliability concerns.
Red Flags
- 15 material findings and 15 corrective actions identified by Bureau Veritas, including PDD inaccuracies in metering, boundary, emissions description, and monitoring-plan deficiencies in QA/QC, calibration, and data-source documentation
- Internal contradiction in the 2016 monitoring report: total ERR claimed appears as both 415,893 and 25,746 tCO₂e in the same document, creating ambiguity about the correct ex-ante baseline
- Leakage is described as 'quantified' in the monitoring report but no specific deduction percentage is stated in any available document
- Baseline method is characterised as 'jurisdictional' in the 2016 monitoring report but 'project' in the 2012 PDD, creating uncertainty about the actual baseline construction
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 113,956 | 0 | 113,956 | |
| 2013 | 321,755 | 0 | 321,755 | |
| 2017 | 498,029 | 0 | 498,029 | |
| Total | 933,740 | 0 | 933,740 |
Risk Indicators
Combined test, VVB-confirmed
Fossil fuel switch, no reversal risk
Quantified but no % stated
Grid-EF based, method contradiction
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →