Expansion of Natural Gas Based Combined Cycle Power Project from 225 MW to 450 MW by adding Phase II
Methodology: AM0029 (CDM)
Assessment
Analysis queued
This project is in the analysis queue and has not been rated yet. Registry data, credit vintages and purchase availability below reflect the latest registry snapshot; the quality score will appear here once the analysis completes.
Standard and methodology
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
No issuances recorded on the registry.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Grid connected electricity generation using natural gas by the Vemagiri Power Generation Ltd.CDM-4334
- Combined cycle natural gas based grid connected power plant at Jegurupadu, IndiaCDM-5257
- China Fujian Putian LNG Generation ProjectCDM-1859
- Grid Connected Gas based Combined Cycle Power Project in Andhra PradeshCDM-8323
- Grid-connected Combined Cycle Power Plant of capacity 219.067 MW using Natural Gas/ R-LNG as fuels at Gujarat, India.CDM-1352
- Huadian Guangzhou Higher Education Mega Center LNG-fired Power Generation Project in ChinaCDM-3786
- Grid connected natural gas based electricity generation power plant at Vemagiri, Andhra Pradesh, IndiaCDM-6943
- OML58 IPP Gas Fired Generation ProjectCDM-9391
