Grid-connected Combined Cycle Power Plant of capacity 219.067 MW using Natural Gas/ R-LNG as fuels at Gujarat, India.
#6of 1329 in Industrial#49of 975 in India#52of 1459 in CDM (UNFCCC)#1of 19 in AM0029
Audit Analysis
A well-structured CDM fossil-fuel-switch project (219 MW gas combined-cycle plant in Gujarat, India) with a jurisdictional grid baseline, VVB-confirmed additionality, and a detailed quantified leakage calculation. The main concerns are a 36% gap between the PDD grid emission factor (0.63) and the monitoring-period value (0.8587), several transparency fields left unstated (fnrb method, usage monitoring, CORSIA/CCP status), and medium extraction confidence across 12 source documents. Overall a credible but mid-tier credit with no critical red flags.
Red Flags
- Grid emission factor used in the 2014 monitoring report (0.8587 tCO2e/kWh) is 36% higher than the PDD value (0.63), inflating the baseline and therefore the credit volume relative to the ex-ante estimate.
- Verified ERR (218,443 tCO2e) exceeds the project proponent's claimed ERR (214,495 tCO2e) by ~1.8% in the same 2014 monitoring report, an unusual inversion that warrants scrutiny of the VVB's calculation basis.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 21,965 | 0 | 21,965 | |
| 2010 | 49,504 | 0 | 49,504 | |
| 2012 | 254,336 | 0 | 254,336 | |
| 2014 | 925,268 | 0 | 925,268 | |
| Total | 1,251,073 | 0 | 1,251,073 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Quantified 145,341 tCO2e deduction
Jurisdictional grid EF (2012)
Mentioned but FPIC/grievance not detailed
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →