119.8 MW Natural Gas Based Combined Cycle Power Plant, At Tanjavur, Tamilnadu By M/S Aban Power Company Limited
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB.
missing Leakage is described as quantified, but the leakage deduction percentage and key baseline inputs (e.g., grid emission factor) are not found in the extracted record.
Transparency
verified Claimed and verified emission reductions match (1,354,428 tCO2e) for the stated monitoring period in the monitoring/verification record.
missing The monitoring report includes several documentation and calculation-related corrective actions, reducing confidence in MRV clarity and completeness.
Claim Safety
verified No material findings were reported in the extracted verification outcomes.
missing CORSIA and CCP status are not stated in available documents, and the monitoring report requested a declaration to avoid double counting (including India REC), elevating claims risk.
Documentation
verified Multiple official document types were used (monitoring report and validation report) with high extraction confidence.
missing Numerous corrective actions in the monitoring report indicate incomplete/incorrect reporting elements at the time of assessment.
Detailed Analysis
Integrity
The validation/verification record indicates additionality was confirmed by the VVB (Earthood Services Private Limited), which supports additionality robustness. The baseline is described as project-specific, and the timing of any baseline reassessment is not stated in available documents, which weakens confidence that baseline assumptions remained appropriate over time. Leakage is described as quantified, but the actual leakage deduction percentage is not found in the extracted record, limiting the ability to judge conservativeness.
Transparency
For the monitoring period 2010-12-16 to 2015-08-10, the monitoring/verification record shows the same total emission reductions claimed and verified (1,354,428 tCO2e), which is a positive signal for MRV consistency. However, the monitoring report (2021-09-20) lists multiple corrective actions (e.g., missing ex-ante emissions calculations in the MR and missing conservativeness rounding application in the ER sheet), which reduces transparency and auditability of the calculations from the extracted record. Key quantitative inputs such as the grid emission factor year/value are not found in the extracted record.
Claim Safety
Over-crediting risk is moderately elevated because the baseline is project-specific and key baseline inputs (including the grid emission factor) are not found in the extracted record, making independent reasonableness checks difficult. The monitoring report includes a corrective action requesting a declaration to avoid double counting with other GHG programs and India’s REC mechanism, indicating this risk needed explicit mitigation at the time of review. CORSIA eligibility and CCP status are not stated in available documents, so downstream claims compatibility cannot be confirmed from the extracted record.
Documentation
The extracted package includes a monitoring report and validation report (plus an additional unidentified document type), with four documents used and high extraction confidence, supporting a mid-to-good documentation score. Nonetheless, the monitoring report (2021-09-20) contains numerous corrective actions related to formatting, missing location evidence, incomplete sections, and missing calculation elements, indicating the documentation set was not fully compliant/complete at the time assessed. Several important fields (e.g., baseline reassessment timing, leakage deduction percentage, grid emission factor details) are not found in the extracted record.
Overall
No contradictions were identified in the extracted record, so scores are not adjusted for cross-document discrepancies. The strongest positives are VVB-confirmed additionality and the match between claimed and verified emission reductions for the monitoring period. The main constraints on the overall score are evidence gaps on baseline inputs/reassessment and leakage quantification, plus the breadth of corrective actions in the monitoring report, which collectively increase uncertainty and claims risk. (Gate note: documentation is above 3.0 and integrity is above 4.0, so no post-scoring caps would be triggered.)
Audit Analysis
This VCS power project has VVB-confirmed additionality and matching claimed vs verified emission reductions for the monitored period, which supports basic credibility. However, the extracted record shows important gaps around baseline reassessment, grid emission factor disclosure, and leakage deduction quantification, and the monitoring report lists numerous corrective actions that point to MRV and reporting quality weaknesses.
Project Description
This project set up a cleaner, 119.8 MW Natural Gas based Combined Cycle Power Plant, which reduced Carbon Dioxide emissions while increasing Tamilnadu State Electricity Board's installed electricity generating capacity. This helped bridge the gap between demand and supply of electrical energy in the state and contributed to the economic growth and development of the area. The project's verification report and statement were dated September 3, 2009.
Red Flags
- Monitoring report lists multiple corrective actions, including missing ex-ante baseline/project/leakage calculations and missing conservativeness rounding application, indicating MRV/reporting weaknesses.
- Baseline is project-specific and the timing of any baseline reassessment and the grid emission factor inputs are not found in the extracted record, increasing over-crediting risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2005 | 23,500 | 5,194 | 18,306 | |
| 2010 | 35,516 | 35,516 | 0 | |
| 2011 | 328,572 | 328,572 | 0 | |
| 2012 | 343,655 | 343,655 | 0 | |
| 2013 | 275,527 | 265,061 | 10,466 | |
| 2014 | 223,162 | 193,162 | 30,000 | |
| 2015 | 147,996 | 147,996 | 0 | |
| Total | 1,377,928 | 1,319,156 | 58,772 |
Cosa migliorerebbe questo punteggio
- Disclose and clearly document baseline inputs (grid emission factor value/year and calculation approach) and any baseline reassessment evidence for the monitoring period.
- Provide the quantified leakage deduction (percentage and calculation) and close all monitoring report corrective actions, including conservativeness rounding and complete ex-ante emissions calculation sections.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal risk indicated for this project type
Quantified in narrative, but deduction not evidenced
Project-specific baseline; reassessment timing unclear
Safeguards and grievance noted; FPIC not evidenced
CORSIA/CCP status not stated; double-counting declaration requested
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →