Zhangjiagang Nature Gas Power Generation Project
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB using an investment test.
missing The monitoring report required a correction to the natural gas CO2 emission factor and ER calculation sheet, creating over-crediting risk if not resolved.
Transparency
verified A named VVB (Det Norske Veritas) and a defined monitoring period (2005-06-08 to 2009-09-10) are provided in the monitoring report.
missing Total claimed ERs and the leakage deduction percentage are not found in the extracted record, reducing MRV traceability.
Claim Safety
verified The project is explicitly marked as not CORSIA-eligible, reducing aviation-claim channel risk.
missing Baseline is project-specific and key parameters (e.g., leakage deduction and baseline reassessment timing) are missing or inconsistent across documents.
Documentation
verified Core documents are present (PDD, validation report, monitoring report) with high extraction confidence.
missing Safeguards-related documentation (FPIC, grievance mechanism, benefit sharing) is not evidenced in the extracted record.
Detailed Analysis
Integrity
The validation/verification record indicates additionality was confirmed by the VVB using an investment test (validation/verification documentation referenced in the extracted record). The monitoring report (2010) includes a corrective action because the natural gas CO2 emission factor used (54.3 tCO2/TJ) was not consistent with the registered PDD and required applying the IPCC 2006 default value, implying potential miscalculation of ERs until corrected. Leakage is described as quantified in the monitoring report (2010), but the actual leakage deduction percentage is not found in the extracted record. No material findings are reported, but the presence of a corrective action still weakens confidence in the ER calculation quality.
Transparency
The monitoring report (2010) clearly states the monitoring period (2005-06-08 to 2009-09-10) and identifies the VVB as Det Norske Veritas, supporting basic audit traceability. However, total claimed ERs are not found in the extracted record, while total verified ERs are reported as 2,707,872, limiting the ability to reconcile what was requested versus what was issued. Leakage is said to be quantified, but without a stated deduction percentage, the MRV trail is incomplete. Extraction confidence is high and multiple document types are available (PDD, validation report, monitoring report), which supports a mid-to-good transparency score despite gaps.
Claim Safety
The project is explicitly not CORSIA-eligible, which reduces the risk of higher-stakes aviation claims being made from these credits. Over-crediting risk is elevated by the monitoring report (2010) corrective action requiring correction of the natural gas CO2 emission factor and ER calculation sheet. The baseline approach is project-specific (as stated in the extracted record), and the timing of any baseline reassessment is not found, which increases uncertainty about baseline conservativeness over time. Leakage treatment is inconsistent across documents, further increasing claim risk.
Documentation
Key document types are present in the extracted record (PDD, validation report, monitoring report) and the minimum extraction confidence is high, indicating the underlying documents were readable enough for reliable extraction. The monitoring report (2010) provides specific corrective action text, which is a strong documentation signal even though it flags a problem. Safeguards-related elements are not evidenced (no FPIC, no grievance mechanism, no benefit sharing described), suggesting either missing documentation or absence of these processes in project design. Some important quantitative fields (total claimed ERs, leakage deduction percentage, baseline reassessment date) are not found in the extracted record, reducing completeness.
Overall
Overall quality is moderate: additionality is VVB-confirmed, but MRV reliability is weakened by a required correction to a key emissions factor in the monitoring report (2010). The main contradiction is on leakage: the PDD (2009) does not address leakage, while the monitoring report (2010) states leakage was quantified; I privilege the monitoring report because it is later and reflects implemented monitoring, but the inconsistency still reduces confidence and lowers integrity/claim-safety scores. Missing quantitative items (total claimed ERs and leakage deduction percentage) prevent a full reconciliation of credited reductions. Note: if documentation were to score below 3.0, transparency would be capped post-scoring; and if integrity were below 4.0, overall would be capped at 6.0 (gate rules).
Audit Analysis
The project has VVB-confirmed additionality (investment test) and a quantified approach to leakage is referenced in monitoring, but key quantitative elements (claimed ERs, leakage deduction, baseline reassessment timing) are missing from the extracted record. A corrective action on the natural gas CO2 emission factor indicates a real over-crediting risk if not corrected. Safeguards and grievance provisions are not evidenced in the available documents, increasing non-carbon integrity and reputational risk.
Project Description
The Zhangjiagang Nature Gas Power Generation Project is a brand new power plant built in East China's Jiangsu Province with the aim of using natural gas as fuel to supply electricity to JPG. The plant is run by Zhangjiagang Huaxing Power Co., Ltd and uses a 9F-level gas-steam combined cycle power generation technology. It has a total installation capacity of 780MW and produces an annual net electricity output of 2675.4GWh.
Red Flags
- Corrective action required to fix an incorrect natural gas CO2 emission factor in the monitoring report and ER calculation sheet, which could materially affect credited reductions.
- Leakage treatment is inconsistent across documents (PDD does not address leakage, while the monitoring report says leakage was quantified).
- No leakage deduction percentage and no total claimed ERs found in the extracted record, limiting independent checks of issuance accuracy.
- Safeguards, FPIC, and grievance mechanism are not evidenced in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2005 | 87,870 | 2,592 | 85,278 | |
| 2006 | 642,967 | 0 | 642,967 | |
| 2007 | 599,357 | 500,000 | 99,357 | |
| 2008 | 667,161 | 654,143 | 13,018 | |
| 2009 | 550,517 | 401,834 | 148,683 | |
| Total | 2,547,872 | 1,558,569 | 989,303 |
Cosa migliorerebbe questo punteggio
- Disclose the total claimed ERs, the final corrected ER calculation sheet, and the final applied natural gas CO2 emission factor consistent with the registered PDD/IPCC 2006 defaults.
- Provide explicit leakage results including the leakage deduction percentage and a clear cross-reference showing how leakage was treated consistently from the PDD through monitoring.
- Add publicly available safeguards documentation (stakeholder consultation outcomes, FPIC where relevant, and a functioning grievance mechanism) to reduce reputational and social-risk concerns.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal risk indicated for power generation
Quantified claimed but deduction not stated
Project-specific baseline; reassessment not evidenced
No FPIC/grievance evidence found
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →