Vai al contenuto principale
VCS Other India Registry: Late to verify Documentazione completa General Methodology v2.0

Natural Gas Based Grid Connected Power Project At Peddapuram, A.P. By Gautami Power Limited

VCS-1002 ↗

5.4 / 10
Integrity
6.4
Transparency
4.8
Claim Safety
5.2
Documentation
4.1

Score Breakdown

Integrity

verified The VVB confirmed additionality through an investment test, and the verification report recorded no material findings.

missing Leakage treatment is not quantified in the extracted record, and no buffer pool or reversal management is stated.

Transparency

verified The monitoring period and verification outcome are identified, and the total verified reductions match the total claimed reductions.

missing Public MRV detail is thin: the grid emission factor, usage monitoring method, and leakage deduction are not stated in available documents.

Claim Safety

verified The verified and claimed emission reductions are identical, which reduces immediate over-issuance concern.

missing The baseline is project-specific rather than a more conservative standardized baseline, and CORSIA eligibility is false while CCP status is not stated.

Documentation

verified Twelve documents were used and the extraction confidence is medium rather than low.

missing The record lacks key safeguards documentation and contains contradictions on safeguards and the crediting period.

Detailed Analysis

Integrity

Additionality is reasonably supported because the verification report confirms an investment test and the VVB found no material findings. However, permanence and leakage controls are only partially evidenced: no buffer pool is stated, no reversal events are reported, and leakage treatment is described only as quantified without a visible deduction percentage in the extracted record.

Transparency

The monitoring period and verification totals are clearly stated, and the verified reductions equal the claimed reductions. Even so, important MRV details are missing from available documents, including the grid emission factor, the usage monitoring method, and a specific leakage deduction, which limits transparency.

Claim Safety

Claim safety is moderate because the verified and claimed emission totals match exactly, reducing obvious over-crediting concerns. That said, the baseline is project-specific under AM0029 rather than a clearly standardized or jurisdictional baseline, and the project is not CORSIA-eligible while CCP status is not stated, leaving some market-claim uncertainty.

Documentation

Documentation quality is mixed: twelve documents were used and extraction confidence is medium, which is better than a poor record. But safeguards are weakly documented, with FPIC and a grievance mechanism not found, and the record does not show corrective actions; this is further weakened by contradictions in the extracted documents.

Overall

The project looks moderately credible on additionality and verified issuance, but the evidence base is incomplete on leakage, permanence, and safeguards. I privileged the later and more specific crediting-period statement ending in 2019-06-04 over the earlier shorter period because it appears to reflect the final project term, but the contradiction still lowers reliability. I also treated the later document’s lack of safeguards mention as more concerning than the earlier mention because the extracted record does not preserve enough detail to confirm that safeguards were actually implemented.

Audit Analysis

The project has some integrity support because additionality was confirmed by the VVB and the verification found no material findings, but key risk controls are thinly documented. Transparency and documentation are limited by missing public-facing MRV details, no stated leakage deduction, and weak safeguards evidence; the record also contains contradictions on safeguards and the crediting period that reduce confidence.

Project Description

GVK Gautami Power Ltd. has commissioned a new, green field 469 MW natural gas-fired power plant in East Godavari district, Andhra Pradesh, India, which uses cleaner fuel than the typical coal-dominated Indian power sector. By using natural gas, the project avoids significant emissions, making it an environmentally friendly solution for power generation.

Red Flags

  • No buffer pool or reversal management is stated, so permanence protection is not evidenced in the extracted record.
  • Safeguards are weakly documented: FPIC and a grievance mechanism are not found, and the record contradicts itself on whether safeguards were mentioned.
  • The crediting period is inconsistent across documents, which raises reliability concerns about the extracted record.

Credit Vintages

Issued Retired Available
2009
674,253 669,091 5,162
2010
1,197,415 1,107,714 89,701
2011
729,315 600,399 128,916
Total 2,600,983 2,377,204 223,779

Cosa migliorerebbe questo punteggio

  • Provide the full monitoring and verification package showing the leakage deduction, baseline calculations, and any buffer or reversal provisions.
  • Publish clear safeguards evidence, including FPIC, grievance procedures, and any benefit-sharing or stakeholder consultation records.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool stated

Leakage

Leakage not clearly quantified

Baseline

Project baseline, reassessment timing limited

Safeguards

No FPIC or grievance evidence

Double-claim

Not CORSIA-eligible; CCP not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti