GS-BIODIGESTER — Baseline and Monitoring Methodology for Biodigesters
About this methodology
- Issued by
- Gold Standard (GS) · issuer's site
- Official page
- globalgoals.goldstandard.org
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Deductions that can apply
A methane activity the law requires A-LEGAL
The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Usage rate of the devices: the methodology asks for none (§7, p. 15). It measures the fuel that households use, with a questionnaire in each monitoring period. No usage deduction applies. Our current method does not assess it. CM-F-GS-BIODIGESTER-USAGE
- not assessed
Durability of the storage: the methodology sets rules for it in some cases (§5, p. 13). Our current method does not assess it. CM-F-GS-BIODIGESTER-DURABILITY-MEASUREMENT
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-GS-BIODIGESTER-SAFEGUARDS-FPIC
fNRB above the official value, or an older default Q-FNRB-ABOVE
CarbonMeld compares the fraction of non-renewable biomass (fNRB) with the official national value of the country. The rule applies to any project whose documents give an fNRB that CarbonMeld can compare with the official value. A project gets one fNRB deduction at most. Three sources of values get no deduction: TOOL33 version 03.0, A6.4-AMT-009, and a MoFuSS assessment whose stated year is 2024 or later.
Above the official national value plus its 30% uncertainty.
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-LEAKAGELeakage
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Projects using GS-BIODIGESTER
Browse 9 published projects using GS-BIODIGESTER, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under GS-BIODIGESTER?
In CarbonMeld's data, GS-BIODIGESTER projects are on one registry: Gold Standard (9 projects, 9 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Gold Standard (GS) | 9 | 9 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
4 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages show the analysis.
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not yet assessable
- Analysis: Re-assessment pending