Skip to main content
GSBiogas - HeatChinaGeneral Methodologyv2.1

Biogas Tanks in Guizhou Province in China

GS-1081 ↗ · current registry ID: GS614

#215of 268 in Biogas#1006of 1084 in China#1591of 1801 in Gold Standard (GS)

4.0/ 10
Integrity
3.5
Transparency
5.0
Claim Safety
3.0
Documentation
5.5

Audit Analysis

This Gold Standard biogas project in Guizhou, China, has a verified additionality assessment but suffers from serious permanence concerns (35 tanks permanently out of service, 46% winter failure rate) with no buffer pool to cover reversals. Leakage was not addressed in the later PDD revision, and the project-specific baseline contained documented errors in seasonal fuel consumption. Multiple contradictions across monitoring and verification reports, combined with a shift in the fuel-to-net-replacement-benefit factor from a local field value to a lower national default, raise over-crediting risk.

Red Flags

  • 35 glass-fibre biogas tanks permanently out of service and replaced with concrete tanks, with no buffer pool to cover the resulting credit reversals
  • 46% winter failure rate in Danzhai attributed to cold weather and structural issues with glass-fibre tanks, indicating systemic equipment risk
  • Leakage was not addressed in the later PDD revision (November 2009), despite being deemed negligible in the earlier PDD (January 2009)
  • Baseline survey errors: Danzhai used annual averages instead of seasonal averages, and Weining excluded fuel used for animal feed, both distorting the emission reduction calculation
  • FNRB value dropped from 85 (local field, PDD 2009) to 63.19 (national default, monitoring 2014), increasing the credit output per unit of fuel displaced

Credit Vintages Exhausted

IssuedRetiredAvailable
2008
5425420
2009
1,4551,4550
2010
2,3142,3140
2011
3,3813,3810
2012
2,6312,6310
2013
1,5921,5920
2014
2412410
Total12,15612,1560

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

mixed evidence / unresolved risk

Leakage

Not addressed in later PDD revision

Baseline

Project-specific, documented errors, 2008 reassessment

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents