Biogas Tanks in Guizhou Province in China
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification report reports no material findings.
missing Leakage justification is not addressed, buffer pool coverage is not stated, and a broken biodigester was diagnosed in May 2013 without clear reversal treatment.
Transparency
verified The project has a named verifier, a defined monitoring period from 2012-04-01 to 2014-03-31, and matching claimed and verified reductions of 2,977 tCO2e in the 2013 verification report.
inferred Monitoring of usage relies on self-reporting, and the usage rate itself is not stated in the extracted record.
Claim Safety
missing The baseline is project-specific rather than standardized, and the last reassessment is only stated as 2008.
inferred Leakage is not quantified, and the record does not state whether the project is CORSIA-eligible or CCP-approved.
Documentation
verified Three document types were used, with 12 extracted facts and medium extraction confidence.
missing The monitoring and verification record leaves several fields unstated, including buffer pool coverage, leakage treatment, and usage-rate verification.
Detailed Analysis
Integrity
The verification report confirms additionality through a combined test and says there were no material findings, which supports the project’s core integrity. At the same time, leakage is not addressed, buffer pool coverage is not stated, and the report notes a broken biodigester diagnosed in May 2013 without a clear reversal resolution. The project also relies on a project baseline last reassessed in 2008, which is dated and weakens confidence in baseline validity.
Transparency
Transparency is moderate because the record includes a named verifier, a clear monitoring period, and a verification report with claimed and verified reductions both shown as 2,977. However, usage monitoring is based on self-reporting, the usage rate is not stated, and leakage treatment is missing. The documentation is therefore usable but not especially robust.
Claim Safety
Claim safety is weakened by the project-specific baseline and the absence of quantified leakage treatment. The record does not provide enough information on usage rates or eligibility status to rule out over-crediting or dual-claim concerns. The matching claimed and verified reductions help, but the contradictions in the extracted record reduce confidence.
Documentation
The evidence base is broader than minimal, with a PDD, verification report, and monitoring report all used, and extraction confidence is medium rather than low. Still, several important items are not stated in available documents, including buffer pool coverage, leakage deduction, and verified usage rate. That leaves the documentation adequate but incomplete for a high-confidence assessment.
Overall
I privileged the 2013 verification report over the earlier 2011 figures because it is the more recent and project-verification-specific source, so I used 2,977 tCO2e as the verified and claimed amount. I also privileged the later PDD entry for the combined additionality test over the earlier investment-test wording because it appears to be the updated project design document. The contradictions on reversal events and emission reductions indicate some extraction or reporting inconsistency, so I reduced confidence and did not score the project as highly robust.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality and no material findings reported in the verification report. However, key risk areas are weakly documented: leakage is not addressed, reversal handling is inconsistent, and the project uses a project-specific baseline that was last reassessed in 2008. Overall, the evidence supports a moderate but not high-confidence assessment.
Project Description
Developer: GoodPlanet Type: Biogas - Heat Size: Microscale Methodology: GS Baseline and Monitoring Methodology Biodigester v1. Crediting period: 2008-04-01 → 2018-03-31 Estimated annual credits: 4655 tCO2e SDGs: Goal 12: Responsible Production and Consumption, Goal 3: Good Health and Well-Being, Goal 13: Climate Action
Red Flags
- Leakage is not addressed and no deduction is stated in the available documents.
- The record contains contradictions on reversal events and on the verified emission reductions, which weakens reliability.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 542 | 542 | 0 | |
| 2009 | 1,455 | 1,455 | 0 | |
| 2010 | 2,314 | 2,314 | 0 | |
| 2011 | 3,381 | 3,381 | 0 | |
| 2012 | 2,631 | 2,631 | 0 | |
| 2013 | 1,592 | 1,592 | 0 | |
| 2014 | 241 | 241 | 0 | |
| Total | 12,156 | 12,156 | 0 |
Cosa migliorerebbe questo punteggio
- Provide a quantified leakage assessment and explain why leakage is negligible or how it is deducted.
- Clarify reversal handling and update the baseline reassessment with a more recent, documented review.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
reversal issue not clearly resolved
leakage not addressed
project baseline, reassessment dated 2008
FPIC and grievance mechanism documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Monitoring Report_2nd monitoring period_01-04-09 to 31-03-10_v3.0.doc
- Monitoring Report_5th monitoring period_01-04-12 to 31-03-14_v3.0.pdf
- Monitoring Report_1st monitoring period_01-04-08 to 31-03-09_v4.0.pdf
- Monitoring Report_4th monitoring period_01-04-11 to 31-03-12_v2.0.pdf
- Monitoring Report_3rd monitoring period_01-04-10 to 31-03-11_v3.0.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →