Skip to main content
GSBiogas - HeatChinaGeneral Methodologyv2.1

Xuyong household biogas Gold Standard VER Project

GS-30 ↗ · current registry ID: GS1033

#74of 268 in Biogas#539of 1084 in China#664of 1801 in Gold Standard (GS)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The Xuyong household biogas project has a verified additionality assessment and an independent VVB, but is undermined by a 0% leakage deduction with no documented justification, a project-specific baseline with no recorded reassessment, and 12 outstanding corrective actions. The verified ERR for the most recent monitoring period matches the claimed figure, though the project delivered roughly 72% of the pro-rata lifetime expectation for the elapsed period, and several key data points (FNRB, grid emission factor, carbon content testing) are absent from the record.

Red Flags

  • Leakage deduction is 0% and the justification is recorded as 'not addressed' in the most recent monitoring report (2023-09-04), leaving no documented basis for the zero deduction
  • Twelve corrective actions were required by the VVB (SustainCERT) in the verification report dated 2023-09-08, including clarifying annual average ERs, correcting digester counts, and submitting survey team details and training records
  • Usage rate was assumed at 100% in the PDD but verified at only 95% in the 2023 monitoring report, indicating a 5% over-claim in the ex-ante estimate
  • No FPIC (Free, Prior and Informed Consent) documentation was found in the extracted record despite the project serving rural households in China

Credit Vintages

IssuedRetiredAvailable
2012
3,7453,67174
2013
4,6874,67215
2014
4,6874,6870
2015
4,6764,6760
2016
4,6194,6190
2017
4,5974,5970
2018
4,4594,4590
2019
4,5844,5840
2020
4,5412,9961,545
2021
4,766934,673
2022
53910529
Total45,90039,0646,836

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Biogas – no carbon-stock reversal risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific, no reassessment date

Safeguards

Grievance mechanism present, FPIC not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents