Hassan Composite Vermicompost Biogas Project
GS-1083 ↗ · current registry ID: GS615
#116of 268 in Biogas#611of 975 in India#962of 1801 in Gold Standard (GS)
Audit Analysis
A small-scale biogas project in Hassan, India, with 516 biodigesters, verified under Gold Standard. Additionality is confirmed by the VVB and a 10% leakage deduction is applied, but the project-specific baseline, absence of a buffer pool, unaddressed reversal risk, and missing safeguards documentation limit confidence in the integrity of the claims. Several contradictions between the monitoring and verification reports introduce data-reliability concerns.
Red Flags
- Reversal events are explicitly noted as 'not addressed' in the verification report, and no buffer pool percentage is stated, leaving permanence risk unquantified
- Contradiction between the verification report (leakage 'quantified') and the monitoring report (leakage 'deemed negligible') undermines confidence in the 10% deduction
- No FPIC, grievance mechanism, or safeguards documentation found in any available record
- Crediting period end date is not stated in the verification report, making the full project duration and remaining credit validity unclear
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 307 | 307 | 0 | |
| 2009 | 2,067 | 2,067 | 0 | |
| 2010 | 2,711 | 2,622 | 89 | |
| 2011 | 2,673 | 2,673 | 0 | |
| 2012 | 2,709 | 2,709 | 0 | |
| 2013 | 2,626 | 2,626 | 0 | |
| 2014 | 2,700 | 2,700 | 0 | |
| 2015 | 2,609 | 2,609 | 0 | |
| 2016 | 2,731 | 2,731 | 0 | |
| 2017 | 2,035 | 2,035 | 0 | |
| 2018 | 1,696 | 1,696 | 0 | |
| Total | 24,864 | 24,775 | 89 |
Risk Indicators
VVB-confirmed, test type unspecified
mixed evidence / unresolved risk
10% deduction applied but justification contradicted
Project-specific, reassessment date not stated
No FPIC, grievance, or safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →