Leakage: the methodology sets rules for it (ACM0009 v05, p. 11). CarbonMeld reads it in the project's documents. CM-F-ACM0009-LEAKAGE
ACM0009 — Fuel switching from coal or petroleum fuel to natural gas
About this methodology
Projects replace coal or petroleum fuels with natural gas for industrial heating. The method measures the reduction in emissions from providing that heat.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 5.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Industrial heat
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (2 projects)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0009-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Replaces AM0008
AM0008 | Industrial fuel switching from coal and petroleum fuels to natural gas without extension of capacity and lifetime of the facility --- Version 1.0 | ACM0009 | EB 24
All 7 versions
-
v05.0adopted 28 Nov 2014source
-
v04.0adopted 20 Jul 2012source
Corrects errors with regard to the use of IPCC default values.
-
v03.2adopted 28 May 2009source
Editorial revision excluding start-up fuel from the baseline fuels and updating monitoring methodology/table.
-
v03.1adopted 13 Oct 2006source
Editorial revision to the applicability conditions in the monitoring section, removing the condition on page 11: "The natural gas used in the project activity is not generated from liquified natural gas (LNG) or compressed natural gas …
-
v03.0adopted 28 Jul 2006source
Expansion of applicability conditions to include projects in other sectors, including fuel switches in heat-only boilers in the district heating sector.
-
v02.0adopted 19 May 2006source
Inclusion of CO2 emissions from LNG under Leakage section; Other editorial changes.
-
v01.0adopted 3 Mar 2006source
Initial adoption.
Projects using ACM0009
Browse 22 published projects using ACM0009, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ACM0009?
In CarbonMeld's data, ACM0009 projects are on 2 registries: CDM (20) and Verra (2). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 20 | 5 | See the list |
| Verra (VCS) | 2 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
