Fuel switchover from higher carbon intensive fuels to Natural Gas (NG) at Indian Farmers Fertiliser Cooperative Ltd (IFFCO) in Phulpur Village, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd (IFFCO)
#43of 1329 in Industrial#158of 975 in India#194of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM fuel-switchover project at IFFCO's Allahabad fertilizer plant replacing naphtha and heavy fuel oil with natural gas, verified by DNV. Additionality is well-supported by a combined investment-and-barrier test confirmed by the VVB, and the project delivered roughly 53% of its pro-rata expected reductions, indicating conservative crediting. Key gaps include an unquantified leakage percentage, a project-specific baseline, and missing CORSIA/CCP status information.
Red Flags
- Leakage is described as 'quantified' in the monitoring report but the actual deduction percentage is not stated in any available document, making it impossible to verify the magnitude of the leakage treatment.
- The crediting period in the PDD (2007-11-15 to 2017-11-15) differs from the period in the 2023 monitoring report (2008-03-31 to 2018-03-30), indicating a post-approval adjustment that is not fully explained in the extracted record.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 42,647 | 0 | 42,647 | |
| 2010 | 37,989 | 0 | 37,989 | |
| 2012 | 119,931 | 0 | 119,931 | |
| 2013 | 298,854 | 0 | 298,854 | |
| Total | 499,421 | 0 | 499,421 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
Quantified but % not stated
Project-specific, no reassessment data
Mentioned, FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →