Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-VMR0008-GRID-EF
VMR0008 — Revision to AMS-III.BA.: Recovery and Recycling of Materials from E-waste
About this methodology
Projects collect discarded electronics and recover materials such as metals and plastics. The method measures energy-related emission reductions from replacing virgin material production with recycled materials.
- Issued by
- Verra (VCS) · issuer's site
- Version
- 1.0 · source ·
- Status
- Active at Verra / Verified Carbon Standard · source ·
- Climate outcome
- Emission reductions
- Activity
- Electronics recycling
- Official page
- verra.org ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-VMR0008-REGULATORY-SURPLUS
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases. Our current method does not assess it. CM-F-VMR0008-FEEDSTOCK-SUSTAINABILITY
- not assessed
Tracking of the end use: the methodology sets rules for it. Our current method does not assess it. CM-F-VMR0008-END-USE-TRACKING
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-VMR0008-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-LEAKAGELeakage
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Revision of AMS-III.BA
This methodology revision applies to CDM small-scale methodology AMS-III.BA.
source ·
-
v1.0active from 4 Sept 2023 – 4 Sept 2023currentsource
Initial version
Projects using VMR0008
Browse 5 published projects using VMR0008, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under VMR0008?
In CarbonMeld's data, VMR0008 projects are on one registry: Verra (5 projects, 3 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 5 | 3 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
