Langfang Jinye E-waste recycling and comprehensive utilization project

VCS-5265 ↗

#231of 1084 in China#275of 1339 in Verra (VCS)

5.8/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A VCS e-waste recycling project (VMR0008) with VVB-confirmed additionality and no applicable reversal risk, but weakened by a project-specific baseline, a 0% leakage deduction with minimal justification, and a direct contradiction between the monitoring report and the validation report on whether FPIC was conducted. The project over-delivered relative to its pro-rata expectation for the first monitoring period, which is a positive claim-safety signal.

Red Flags

  • FPIC contradiction: the monitoring report (Sep 2024) states FPIC was conducted, while the more recent validation report (Nov 2025) states it was not — a material safeguard gap if the validation report is correct
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, despite e-waste recycling projects carrying inherent diversion and substitution leakage risks
  • Nine Corrective Action Requests and three Clarification Requests were raised during verification, indicating notable initial documentation deficiencies (all subsequently closed)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, reassessment not stated

Safeguards

FPIC contradicted, grievance present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02VMR0008- Recovery and Recycling of Materials from E-Waste

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents