Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AMS-III.BA — Recovery and recycling of materials from E-waste

About this methodology

Projects collect and recycle discarded electrical and electronic equipment. The method measures energy-related emission reductions from replacing the production of virgin materials with recovered materials.

Version
4.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Electronics recycling
Official page
cdm.unfccc.int ·
Also used by projects of

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AMS-III-BA-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Figures set against the methodology's own values

  • Integrity comparison

    The small-scale limit is 60 kt CO2e per year (p. 5). CarbonMeld compares the project's annual estimate with it. CM-F-AMS-III-BA-SMALL-SCALE-LIMIT

    small-scale limit: 60 kt CO2e per year

    Link

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    No legal requirement for the activity: the methodology sets rules for it (AMS-III.BA v04.0 applicability para 8, p. 5). Our current method does not assess it. CM-F-AMS-III-BA-REGULATORY-SURPLUS

    Link
  • not assessed

    Sustainability of the feedstock: the methodology sets rules for it in some cases (AMS-III.BA v04.0 applicability, p. 4). Our current method does not assess it. CM-F-AMS-III-BA-FEEDSTOCK-SUSTAINABILITY

    Link
  • not assessed

    Tracking of the end use: the methodology sets rules for it (AMS-III.BA v04.0 applicability, p. 3). Our current method does not assess it. CM-F-AMS-III-BA-END-USE-TRACKING

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-BA-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

All 4 versions
  • v04.0adopted 12 Jun 2025source

    EB125, Annex 7 Revision to include glass as recycling material.

  • v03.0adopted 9 Sept 2021source

    Ensure consistent methods in determining the emission factors associated with the consumption of fossil fuel and with the consumption of electricity in the production of virgin plastics.

  • v02.0adopted 31 Aug 2018source

    Update the default values.

  • v01.0adopted 11 May 2012source

    Initial adoption.

Projects using AMS-III.BA

Browse 6 published projects using AMS-III.BA, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-III.BA?

In CarbonMeld's data, AMS-III.BA projects are on 3 registries: Gold Standard (3), Verra (2) and CDM (1). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.

RegistryProjectsRegisteredProjects list
Gold Standard (GS)31See the list
Verra (VCS)22See the list
CDM (UNFCCC)11See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database