Additionality: the standard itself gives it (TREES 3.0 §3.5, p. 30). The project needs no test of its own. CM-F-ART-TREES-ADDITIONALITY
Architecture for REDD+ Transactions (ART)
Browse 30 published projects registered under Architecture for REDD+ Transactions (ART), listed alphabetically. There is no ranking for this standard yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
About this standard
ART is an independent program that credits emission reductions and removals from national and large sub-national REDD+ programs. Its standard is The REDD+ Environmental Excellence Standard (TREES). Its Secretariat is hosted by Winrock International.
- Issuing body
- Architecture for REDD+ Transactions (ART)
- Credit type
- ART credits · source ·
- Registry
- ART Registry (ICE GreenTrace) · source ·
- Methodologies it issues
- 1
- Projects we list
- 30
- ICVCM Core Carbon Principles
- Approved by the ICVCM (, source) ·
- CORSIA
- Official site
- artredd.org ·
How methodology v3 reads projects of this standard
What CarbonMeld reads
- Integrity shown
- shown
Buffer pool: the standard sets rules for it (TREES 3.0 §7.1.1, p. 55). CarbonMeld reads it in the project's documents. CM-F-ART-TREES-BUFFER
Leakage not addressed (forest and land) Q-LEAKAGE-NOT-ADDRESSED
Forest, wetland, peat, grassland and soil carbon: the documents read do not address leakage. Outside REDD+ and reforestation, the rule applies only where the methodology requires a leakage assessment. At the listing stage, the rule does not apply if the programme's listing form has no section on leakage.
Where carbon is stored: the permanence start P-START
CarbonMeld scores permanence only for projects that store carbon. Forest projects start from CCQI's grade of the programme on criterion 3.2. Direct air capture with storage, biogenic emissions capture with storage, other geological storage and biochar start at the top, 8.0. The EU classes these types as permanent carbon removals. Enhanced weathering also starts at 8.0. It shares a family with direct air capture. This start is our own judgement. Concrete carbonation, ocean alkalinity, buried biomass and long-lived materials start at the neutral 5.0. These types have no class in a public source.
Forests: CCQI's grade of the programme.
Set by the standard, not assessed by our current method
- not assessed
Social safeguards and consent of communities (FPIC): the standard sets rules for it (TREES 3.0 §12.4.3, p. 79). Our current method does not assess it. CM-F-ART-TREES-SAFEGUARDS-FPIC
- not assessed
Our current method does not check how realistic the baseline scenario of the project is. An example is the rate of deforestation that the project compares with. CM-F-ART-TREES-BASELINE-REALISM
Not applicable to this type — never a gap in our current method
The criterion does not apply to this standard. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Methodologies
This programme's CCP-approved methodologies (1) →
Methodologies this standard issues (1)
The methodologies of our catalogue that this standard's body issues, with their official titles.
- ART-TREESThe REDD+ Environmental Excellence Standard (TREES)
Methodologies its projects use (1)
Every methodology that a published project of this standard uses, with the number of those projects.
- ART-TREES30 projects
Projects, A–Z
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Rated
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Rated
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Rated
- Analysis: Rating withdrawn — under review
- Analysis: Re-assessment pending
- Analysis: Rated
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Rated
- Analysis: Re-assessment pending
- Analysis: Rating withdrawn — under review
- Analysis: Rated
- Analysis: Re-assessment pending
- Analysis: Rated
- Analysis: Rated
Listed alphabetically, not ranked. A standard's leaderboard is computed automatically once 5 of its projects have a document-based rating and a rankable registry status (projects still in the pipeline or under validation are not ranked). How we rate projects.
