Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

AMS-III.BD — GHG emission reduction due to supply of molten metal instead of ingots for aluminium castings

About this methodology

Projects deliver recycled aluminium to casting facilities in molten form instead of as solid ingots. The method measures emissions saved by avoiding remelting and associated metal losses.

Version
1.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Aluminium
Official page
cdm.unfccc.int ·
Also used by projects of

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-AMS-III-BD-GRID-EF

    Link
  • shown

    Leakage: the methodology sets rules for it in some cases (AMS-III.BD v01.0 Leakage, p. 6). CarbonMeld reads it in the project's documents. CM-F-AMS-III-BD-LEAKAGE

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Figures set against the methodology's own values

  • Integrity comparison

    The small-scale limit is 60 kt CO2e per year (p. 2). CarbonMeld compares the project's annual estimate with it. CM-F-AMS-III-BD-SMALL-SCALE-LIMIT

    small-scale limit: 60 kt CO2e per year

    Link

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-BD-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

Projects using AMS-III.BD

Browse 3 published projects using AMS-III.BD, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-III.BD?

In CarbonMeld's data, AMS-III.BD projects are on 3 registries: CDM (1), Global Carbon Council (1) and Universal Carbon Registry (1). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)11See the list
Global Carbon Council (GCC)10See the list
Universal Carbon Registry (UCR)10See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

← All leaderboards · Full database