Grid emission factor: the methodology sets rules for it (ACM0013 v02, p. 5). CarbonMeld reads it in the project's documents. CM-F-ACM0013-GRID-EF
ACM0013 — Construction and operation of new grid connected fossil fuel fired power plants using a less GHG intensive technology
About this methodology
Projects build fossil-fuel power plants that use more efficient technology than the expected alternative. The method measures emissions saved through this efficiency improvement.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 5.0.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-ACM0013-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-LEAKAGELeakage
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v02adopted 16 May 2008source
The methodology was revised to clarify that in the fourth applicability condition the geographical area has to be limited by the physical borders of the host country and as such cannot be extended to neighboring non-Annex I countries.
-
v01adopted 12 Sept 2007source
Initial adoption
Projects using ACM0013
Browse 57 published projects using ACM0013, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ACM0013?
In CarbonMeld's data, ACM0013 projects are on 2 registries: CDM (56) and Verra (1). Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 56 | 6 | See the list |
| Verra (VCS) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (15 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Greenhouse Gas Abatement from energy efficient power generation through Gas Engines (195 MW Project)Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet