Energy efficient power generation in Tirora, India
#515of 975 in India#744of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM energy-efficiency power generation project in India with VVB-confirmed additionality and no reversal risk, but significant evidence gaps: no monitoring or verification data, a project-specific baseline anchored to a 2008 grid emission factor, and low extraction confidence across the document set. The 10 corrective action requests during validation and a minor contradiction on the additionality test type introduce moderate reliability concerns.
Red Flags
- Low extraction confidence across the document set, meaning key figures may be incomplete or misread
- No monitoring reports or verification reports found in the evidence set — the project's actual performance is unverified
- 10 corrective action requests raised and closed during validation, indicating notable documentation or design issues at the outset
- Grid emission factor fixed at the 2008 value (0.941) with no evidence of periodic updating or baseline reassessment
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Energy-efficiency project, no reversal risk
Deemed negligible, 0% deduction, no quantified justification
Project-specific, 2008 grid EF, no reassessment data
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →