Skip to main content
CDMEE supply sideIndiaACM0013

Energy efficient power generation in Tirora, India

CDM-3225 ↗

#515of 975 in India#744of 1459 in CDM (UNFCCC)

5.1/ 10
Integrity
6.0
Transparency
4.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A CDM energy-efficiency power generation project in India with VVB-confirmed additionality and no reversal risk, but significant evidence gaps: no monitoring or verification data, a project-specific baseline anchored to a 2008 grid emission factor, and low extraction confidence across the document set. The 10 corrective action requests during validation and a minor contradiction on the additionality test type introduce moderate reliability concerns.

Red Flags

  • Low extraction confidence across the document set, meaning key figures may be incomplete or misread
  • No monitoring reports or verification reports found in the evidence set — the project's actual performance is unverified
  • 10 corrective action requests raised and closed during validation, indicating notable documentation or design issues at the outset
  • Grid emission factor fixed at the 2008 value (0.941) with no evidence of periodic updating or baseline reassessment

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Energy-efficiency project, no reversal risk

Leakage

Deemed negligible, 0% deduction, no quantified justification

Baseline

Project-specific, 2008 grid EF, no reassessment data

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0013

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents