Grid emission factor: the methodology sets rules for it. CarbonMeld reads it in the project's documents. CM-F-AM0067-GRID-EF
AM0067 — Methodology for installation of energy efficient transformers in a power distribution grid
About this methodology
Projects install more efficient transformers in an electricity distribution network. The method measures electricity saved through lower no-load losses and the corresponding emission reductions.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 2.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Leakage: the methodology sets rules for it in some cases (AM0067 v02 Leakage, p. 7). CarbonMeld reads it in the project's documents. CM-F-AM0067-LEAKAGE
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it. CM-F-AM0067-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AM0067-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v02adopted 2 Aug 2008source
Removal of applicability condition requiring that the technology of installed new transformer represent less than 20% of total installed transformer in geographic region three years prior to implementation of project activity; Removing the …
-
v01adopted 14 Mar 2008 – 15 Aug 2008source
Initial adoption.
Projects using AM0067
Browse 1 published project using AM0067, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AM0067?
In CarbonMeld's data, AM0067 projects are on one registry: CDM (1 project, 1 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 1 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
One of these projects has no number: additionality, quantification or both have no public grade of its type of project that applies to it yet. Its page shows the analysis.
- Analysis: No public grade applies yet