Additionality: the project must show it with a test. CarbonMeld reads the test in the documents.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-ADDITIONALITY
ISOMETRIC-BIOMASS-STORAGE — Biomass Geological Storage
About this methodology
Biomass is injected into subsurface features or geological formations, such as reservoirs, saline aquifers, caverns or mines, for the long-term storage of its carbon.
- Issued by
- Isometric · issuer's site
- Version
- 1.3 · source ·
- Climate outcome
- CO2 removals
- Activity
- Biomass storage
- Official page
- registry.isometric.com ·
How our current method reads projects of this type
Versions of the official text these rules cover: ISO-bio-oil-geological-storage v1.2, ISO-biomass-geological-storage v1.2
What CarbonMeld reads
- Integrity shown
- shown
Durability of the storage: the methodology sets rules for it. CarbonMeld reads it in the project's documents.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-DURABILITY-MEASUREMENT
- shown
Sustainability of the feedstock: the methodology sets rules for it. CarbonMeld reads it in the project's documents.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-FEEDSTOCK-SUSTAINABILITY
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it. Our current method does not assess it.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-LEAKAGE
- not assessed
Buffer pool: the methodology sets rules for it (bio-oil / biomass v1.2 storage modules, p. 1). Our current method does not assess it.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-BUFFER
- not assessed
Permanence and reversals: the methodology sets rules for it (bio-oil v1.2 eligibility, p. 1). Our current method does not assess it.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-PERMANENCE-REVERSAL
- not assessed
No legal requirement for the activity: the methodology sets rules for it. Our current method does not assess it.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it.CM-F-ISOMETRIC-GEOLOGIC-BIOMASS-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- Grid emission factorCM-N-GRID-EF
- Fraction of non-renewable biomass (fNRB)CM-N-FNRB
- Usage rate of the devicesCM-N-USAGE
- Tracking of the end useCM-N-END-USE-TRACKING
The general rules apply as well. Read the general rules.
History and transitions
All 4 versions · current v1.3
-
v1.3currentsource
Updated to accommodate the new Biomass Feedstock Accounting Module
-
v1.2source
Key requirement changes to GHG Accounting, including the centralisation of requirements into the GHG Accounting Module v1.0.
-
v1.1source
New version release in accordance with that of the Biomass or Bio-oil Storage in Salt Caverns Module (v1.1).
-
v1.0source
Initial Release.
Projects using ISOMETRIC-BIOMASS-STORAGE
Browse 2 published projects using ISOMETRIC-BIOMASS-STORAGE, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects are rated. Open a project to view its registry details and the analysis available for that project.
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
