Skip to main content
Rankings · standard

Top Isometric projects

34 rated projects in this standard · average score 3.8/10 · ranked by CarbonMeld's document-based assessment scores across all four dimensions: integrity, transparency, claim safety and documentation.

← All leaderboards · Full database

#1Project Serra da MantiqueiraISOMETRICOtherRegistry: Registered6/10▲+0.8#2Deep Sky AlphaISOMETRICOtherRegistry: Registered5.5/10▲+1.5#3Project AraçariISOMETRICOtherRegistry: Registered5.5/10▼-0.2
  1. 4
    Charm Bio-oil Geologic StorageISOMETRICOtherRegistry: Registered
    5.2▲+0.9
  2. 5
    Project DouradoISOMETRICOtherRegistry: Registered
    5.2▲+0.3
  3. 6
    A Biochar Project at SatyapuraISOMETRICBiocharRegistry: Registered
    5.1
  4. 7
    HelixISOMETRICOtherRegistry: Registered
    5▲+0.9
  5. 8
    Project CarcaráISOMETRICOtherRegistry: Registered
    4.9▲+0.1
  6. 9
    Ontario Avenue Bio-Oil SequestrationISOMETRICOtherRegistry: Registered
    4.8▲+0.5
  7. 10
    Darjeeling Revival: Monsoon HarvestISOMETRICOtherRegistry: Registered
    4.7▲+0.5
  8. 11
    Kvina River CDR ProjectISOMETRICOtherRegistry: Registered
    4.4▼-0.3
  9. 12
    Darjeeling Revival: Alt x MOLISOMETRICOtherRegistry: Registered
    4.3▼-0.3
  10. 13
    Humboldt Sawmill Company (HSC)ISOMETRICBiocharRegistry: Registered
    4.3▼-0.1
  11. 14
    ZX-24 VulkaneifelISOMETRICOtherRegistry: Registered
    4.3▼-0.2
  12. 15
    La PerlaISOMETRICOtherRegistry: Registered
    4.2▲+0.6
  13. 16
    US Southeast Enhanced Weathering ProjectISOMETRICDACRegistry: Registered
    4.2▲+0.6
  14. 17
    Seoni Enhanced Rock Weathering ProjectISOMETRICDACRegistry: Registered
    4.1▲+0.2
  15. 18
    Charm Range & Plains BiocharISOMETRICBiocharRegistry: Registered
    3.9▲+0.5
  16. 19
    Loblolly ProjectISOMETRICOtherRegistry: Registered
    3.9▼-0.9
  17. 20
    Project CajueiroISOMETRICOtherRegistry: Registered
    3.9
  18. 21
    BurnsvilleISOMETRICOtherRegistry: Registered
    3.8
  19. 22
    Great Plains Organic Waste SequestrationISOMETRICOtherRegistry: Registered
    3.8▲+0.6
  20. 23
    Hampton Roads WAE ProjectISOMETRICOtherRegistry: Registered
    3.8▼-0.7
  21. 24
    Nova Scotia Mineral OAE ProjectISOMETRICOtherRegistry: Registered
    3.5▼-0.7
  22. 25
    Project JuniperISOMETRICOtherRegistry: Terminated
    3.4▲+0.8
  23. 26
    Reforesting the Brazilian Amazon Project 1ISOMETRICOtherRegistry: Registered
    2.8▼-0.7
  24. 27
    Burney Forest Power v1.2ISOMETRICBiocharRegistry: Registered
    2.7▲+0.1
  25. 28
    Project NandaniISOMETRICOtherRegistry: Registered
    2.7▼-1.0
  26. 29
    New England WAE ProjectISOMETRICOtherRegistry: Registered
    2.6▲+0.3
  27. 302.6▲+0.8
  28. 31
    Bio-oil produced from biomassISOMETRICUnited StatesBiomassRegistry: status unavailable
    2▼-0.8
  29. 32
    TIRE ProjectISOMETRICOtherRegistry: Registered
    1.6
  30. 33
    DMS GeorgiaISOMETRICOtherRegistry: Registered
    0.8▼-0.2
  31. 34
    Darjeeling Revival ProjectISOMETRICOtherRegistry: Rejected by the registry
    0.4▼-0.7

Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.