Skip to main content
ISOCarbon RemovalGeneral Methodologyv2.1

Darjeeling Revival: Monsoon Harvest

ISO-1JZJY8NY61S0 ↗

#11of 52 in ISO

4.7/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

Darjeeling Revival: Monsoon Harvest is an early-stage enhanced weathering carbon removal project at the validation stage, with additionality confirmed by 350Solutions and a 2% buffer pool in place. However, the project-specific baseline, a 'deemed negligible' leakage treatment without quantification, six outstanding corrective actions, and a contradiction in the permanence claim (1,000 vs 10,000 years) introduce meaningful uncertainty. No monitoring data exists yet, and several key MRV parameters remain unstated.

Red Flags

  • Permanence claim contradicts between the PDD (1,000 years) and the validation report (10,000 years); the more recent validation report value is privileged but the discrepancy undermines confidence in the permanence assertion.
  • Leakage is 'deemed negligible' with no quantified deduction or detailed justification in the validation report, which is a significant gap for an enhanced weathering project where displaced rock or altered soil chemistry could shift emissions.
  • Six corrective actions remain open at validation, including the absence of a full LCA with uncertainty analysis, long-term yield data, and baseline soil pH maps — all material to the credit claim.
  • No monitoring period, verified ERR, FNRB method, or usage monitoring method is stated in the available documents, leaving the MRV framework largely untested.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

2% buffer, no reversals, but claim contradicted

Leakage

Deemed negligible, no quantified deduction

Baseline

Project-specific, not jurisdictional

Safeguards

Grievance & benefit-sharing present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents