Skip to main content
ISOCarbon RemovalGeneral Methodologyv2.1

La Perla

ISO-1K3MGXD4A1S0 ↗

#21of 52 in ISO

4.2/ 10
Integrity
5.0
Transparency
3.5
Claim Safety
4.5
Documentation
3.0

Audit Analysis

La Perla is an early-stage enhanced weathering carbon removal project under the Isometric standard with a 1,000-year permanence claim and a lifetime estimate of 1,524 tCO₂. The project design document and stakeholder consultation are present, but no verification report, monitoring data, or buffer pool arrangement has been documented, leaving key integrity and transparency questions unresolved. The absence of a quantified leakage deduction and confirmed VVB additionality verification are the most significant gaps.

Red Flags

  • No buffer pool or permanence risk mitigation mechanism is documented for a carbon removal project claiming 1,000-year storage
  • Additionality test (combined) is described in the PDD but VVB confirmation of that test is not found in the extracted record
  • Leakage is deemed negligible without a quantified deduction or detailed justification in the available documents
  • No monitoring report or verified ERR figure exists; the project appears to be at the design stage only

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Combined test in PDD; VVB confirmation not found

Permanence

1,000-yr claim; no buffer pool documented; no reversals

Leakage

Deemed negligible; no quantified deduction or detailed justification

Baseline

Project-specific; no reassessment date recorded

Safeguards

Grievance mechanism and benefit sharing noted; FPIC not confirmed

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents