Brandon Production Facility
Score Breakdown
Integrity
verified The verification report (2024-12-27) confirms additionality using an investment test and reports no material findings.
missing Leakage and permanence risk controls are not evidenced in the extracted record (no leakage deduction/justification; no buffer pool information; no reversal reporting).
Transparency
verified The verification report (2024-12-27) provides a specific monitoring period and a verified total of 14,873.
missing Low extraction confidence and contradictions in key fields (verified removals and crediting period) reduce MRV transparency and traceability.
Claim Safety
verified The project is explicitly not CORSIA-eligible in the extracted record, reducing aviation-claim channel risk.
missing Corrective actions require fixing fossil CO2 subtraction and adding a “carbon negative” disclaimer tied to registry credit management, increasing greenwashing/over-crediting risk.
Documentation
verified A relatively recent verification record is present (dated 2024-12-27) and references multiple documents overall (11 used).
missing Evidence document labeling is weak (listed as “unknown”) and minimum extraction confidence is low, indicating documentation quality/readability issues.
Detailed Analysis
Integrity
The verification report dated 2024-12-27 confirms additionality via an investment test and reports no material findings. However, the extracted record does not provide any leakage deduction or leakage justification, and it also lacks a buffer pool percentage and any clear reversal-event reporting, leaving permanence and leakage controls unsubstantiated. The baseline is described as project-specific, and no baseline reassessment timing is provided, which weakens baseline robustness.
Transparency
The monitoring/crediting period is clearly stated as 2023-10-01 to 2024-09-30 in the verification record (2024-12-27), and a verified total of 14,873 is reported. Transparency is reduced by low extraction confidence and by inconsistencies across documents in key reported figures (notably the verified removals and the crediting period). The absence of stated methods for usage monitoring and fossil/non-fossil parameterization in the extracted record further limits MRV clarity.
Claim Safety
The extracted record states the project is not CORSIA-eligible, which lowers the risk of high-profile aviation-related claims. Claim safety is nevertheless weakened because corrective actions require correcting the fossil CO2 subtraction in the calculation file and adding a marketing disclaimer clarifying that associated credits are managed in the Puro registry, both of which indicate elevated risk of misleading product claims or over-crediting if not tightly controlled. CCP status is not found in the extracted record, leaving uncertainty about alignment with higher-integrity labels.
Documentation
The project has a recent verification record (2024-12-27) and the extraction references 11 documents, which is a positive sign for coverage. Documentation quality is undermined because the minimum extraction confidence is low (suggesting at least one key document was poorly readable) and the evidence document list is not well identified (shown as “unknown”). The presence of required corrective actions also suggests documentation/calculation controls needed strengthening during verification.
Overall
Overall scoring is pulled down primarily by evidence gaps on leakage and permanence controls, plus low documentation reliability. Contradictions were addressed by privileging the most recent verification record dated 2024-12-27 for (1) safeguards being mentioned (true vs false in 2024-01-08), (2) additionality being verified by the VVB (true vs false in 2022-11-17), (3) verified removals (14,873 vs 20,831 in 2024-08-05), and (4) the crediting period (2023-10-01—2024-09-30 vs 2022-10-01—2023-09-30 in 2024-08-05), because it is the latest and explicitly a verification record. Even with that prioritization, the existence of these discrepancies indicates data reliability risk and warrants downward adjustments to transparency, claim safety, and documentation; note that documentation below 3.0 would cap transparency under the stated gate rules.
Audit Analysis
The project has VVB-confirmed additionality via an investment test in the latest verification record, but key integrity parameters (leakage treatment, permanence/buffer, and baseline reassessment timing) are not evidenced in the extracted record. Multiple cross-document inconsistencies (including verified removals and crediting period) and low document readability reduce confidence and increase over-crediting/claims risk.
Project Description
PUR-300346 — Alternative Materials Other
Red Flags
- Verified removals conflict across documents (14,873 vs 20,831), creating over-crediting and reporting reliability risk.
- Leakage treatment is not evidenced (no deduction or justification found), despite being a core integrity element.
- Permanence/risk management is unclear (no buffer pool percentage and no reversal reporting found in the extracted record).
- Corrective actions include a correction to fossil CO2 subtraction in the calculation file and a required marketing disclaimer, indicating prior claims/calculation control weaknesses.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 3,640 | 3,640 | 0 | |
| 2024 | 5,683 | 5,683 | 0 | |
| Total | 9,323 | 9,323 | 0 |
Cosa migliorerebbe questo punteggio
- Publish/clearly reference the underlying calculation workbook and parameter sources (including fossil CO2 subtraction approach) and reconcile the verified removals discrepancy (14,873 vs 20,831) with an auditable change log.
- Provide explicit leakage assessment (quantified deduction or justified negligible leakage) and document permanence/risk management (e.g., buffer contribution or equivalent long-term liability provisions) in publicly accessible project documentation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test (latest verification)
Buffer/reversal controls not evidenced in extracted record
No leakage deduction or justification found
Project-specific baseline; reassessment timing not evidenced
Safeguards mentioned inconsistently; no FPIC or grievance mechanism
Not CORSIA-eligible; CCP status not found
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →