US Southeast Enhanced Weathering Project
Audit Analysis
The Lithos Enhanced Rock Weathering project presents a scientifically credible permanence case (ocean storage exceeding 10,000 years) but is in a very early documentation stage with only a PDD and stakeholder consultation on file. The absence of an independent verification body, a quantified leakage assessment, and the presence of material findings—including concerns about extensive redactions limiting public evaluation—significantly constrain confidence in the project's integrity and transparency.
Red Flags
- Material finding flags 'extensive redactions limiting public evaluation' of the PDD, undermining independent scrutiny of the methodology
- No verification body (VVB) is identified in any available document, leaving additionality verification unconfirmed
- Corrective actions are still outstanding (equation error in section C.3, missing subsampling strategy details in public PDD)
- Leakage is deemed negligible without any quantified deduction or detailed justification in the extracted record
- Storage permanence independent verification not found in available documents
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test present but no VVB verification confirmed
Ocean storage >10,000 yrs; no reversals; low risk
Deemed negligible; no quantified deduction
Project-specific; no reassessment data
Grievance & benefit sharing present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →