5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A newly validated biochar carbon-removal project on the Isometric registry with a verified combined additionality test and no reversal events, but hampered by a project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' an aggressive 200-year permanence claim, and 22 material findings with 20 outstanding corrective actions at the time of validation. The extremely short 13-day monitoring window and the very early stage of the project limit the evidentiary base for scoring.

Red Flags

  • 200-year permanence claim with only a 2% buffer pool is aggressive for a biochar project in its first monitoring period
  • 0% leakage deduction justified solely as 'deemed negligible' without a quantified assessment, despite feedstock (biomass) having alternative uses
  • 22 material findings and 20 corrective actions were open at validation, including an initial mercury exceedance (2 g t⁻¹ DM) that required re-testing by three additional labs
  • Contradiction between the PDD (27,890 tCO₂) and the validation report (34,931 tCO₂) for the lifetime ex-ante estimate, a ~25% gap
  • H₂ was not tested in flue-gas emissions; compliance is deferred to a future protocol transition (v1.2)

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

200-yr claim, 2% buffer, no reversals yet

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents