Skip to main content
ISOCarbon RemovalGeneral Methodologyv2.1

Charm Range & Plains Biochar

ISO-1JN6XNWDQ1S0 ↗

#40of 58 in Biochar#29of 52 in ISO

3.9/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.0

Audit Analysis

The Charm Range & Plains Biochar project has a VVB-verified additionality test and a 2% buffer pool, but the verification report identifies 18 material findings and 8 corrective actions revealing fundamental gaps in reversal-risk management, post-application monitoring, and stakeholder engagement. The 200-year permanence claim is not supported by any mechanism to detect or remedy soil-based reversal, and the 0% leakage deduction rests on a 'deemed negligible' justification that is difficult to reconcile with a model in which Charm hands responsibility to farmers after delivery. Overall, the project's structural design is sound in concept but under-delivers on the operational safeguards that would make its carbon-removal claims credible over the claimed timescale.

Red Flags

  • No mechanism or plan exists for detecting, reporting, or remediating soil-based reversal risks, yet the project claims 200-year permanence (verification report, material findings).
  • Once biochar is delivered, Charm transfers all application, soil-health, and monitoring responsibility to the farmer with no post-application monitoring by Charm (verification report, material findings).
  • 18 material findings and 8 corrective actions were raised in the verification report, including non-compliance with the Isometric Biochar Protocol closure-plan requirements.
  • The PDD does not include a formal declaration of the buffer pool percentage, and the 2% buffer is low relative to a 200-year permanence claim.
  • A discrepancy was observed between the net removals figure in Certify (3.52 tCO2e) and the GHG Statement (3.36 tCO2e), indicating internal reporting inconsistencies.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

2% buffer but no reversal-detection mechanism

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, reassessment not stated

Safeguards

Grievance named but not operational; no FPIC

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents