Skip to main content
ISOCarbon RemovalGeneral Methodologyv2.1

Green Carbon - Kapadvanj Industrial Biochar

ISO-1KCNW12WM1S0 ↗

#26of 58 in Biochar#13of 52 in ISO

4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A newly designed industrial biochar carbon-removal project under the Isometric standard with a 200-year permanence claim and a 2% buffer pool. The project design document shows a combined additionality test, quantified leakage justification, and documented feedstock sustainability, but no independent verification body is identified and no monitoring or verification data exists yet. The limited documentation (PDD only) and absence of a named VVB create meaningful evidence gaps that temper confidence in the claimed 100,170 tCO₂ lifetime removal.

Red Flags

  • No verification body (VVB) is named in the available record, and additionality verification by an independent body is not confirmed
  • Only a single document (the PDD) is available; no verification report, monitoring report, or assurance statement exists
  • 2% buffer pool for a 200-year permanence claim is at the low end of what is typical for long-duration carbon removal credits
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Combined test present; VVB verification not confirmed

Permanence

200-yr claim, 2% buffer, no reversals

Leakage

0% deduction with quantified justification

Baseline

Project-specific; reassessment not yet due

Safeguards

Grievance & benefit-sharing noted; FPIC unconfirmed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents