3.3/ 10
Integrity
4.5
Transparency
1.5
Claim Safety
4.0
Documentation
2.5

Audit Analysis

Sifuri Halisi TZ001-B is a biochar carbon-removal project registered on the Isometric standard. The available record consists solely of a Project Design Document; no verification report, monitoring report, or VVB assessment is present, making it impossible to confirm additionality, validate emissions-removal figures, or assess over-crediting risk. The project design elements (combined additionality test, 1,000-year permanence claim, LCA, carbon-content testing) are reasonable for biochar, but the absence of independent verification and any monitoring data leaves the project's actual performance entirely unverified.

Red Flags

  • No verification report or VVB assessment is available; additionality is stated in the PDD but has not been independently confirmed
  • No monitoring report or verified ERR figures exist, so actual removal performance cannot be assessed against the ex-ante estimate
  • No buffer pool or permanence risk mechanism is documented despite a 1,000-year permanence claim
  • Only a single document (PDD) is in the record, with no document date, limiting traceability and recency assessment

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Combined test in PDD, not VVB-confirmed

Permanence

1,000-yr claim reasonable; no buffer pool

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific; no reassessment date

Safeguards

Grievance & benefit-sharing noted; FPIC unconfirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents