Skip to main content
ISOCarbon RemovalGeneral Methodologyv2.1

Treehouse Plant 1

ISO-1JQEW95GA1S0 ↗

#10of 52 in ISO

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

Treehouse Plant 1 is a pre-issuance biochar carbon removal project under the Isometric standard with a 1000-year permanence claim supported by a modest 2% buffer pool. The project presents a combined additionality test and no reversal events, but lacks independent VVB verification, ERR figures, and a quantified leakage assessment. Documentation is limited to a PDD and stakeholder consultation, reflecting the project's pre-crediting status but leaving significant verification gaps.

Red Flags

  • 1000-year permanence claim supported by only a 2% buffer pool, which may be insufficient for such an extended storage period
  • No VVB name or verification report found in the extracted record, leaving additionality and baseline claims unconfirmed by an independent body
  • Leakage deduction of 0% justified solely as 'deemed negligible' without a quantified assessment or sensitivity analysis
  • No ERR figures (claimed or verified) available, making over- or under-crediting risk unassessable

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Combined test present but VVB verification not stated

Permanence

1000-yr claim with 2% buffer; no reversals yet

Leakage

0% deduction, qualitative justification only

Baseline

Project-specific; no reassessment data

Safeguards

Grievance and benefit sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents