Project Nandani
Audit Analysis
Project Nandani is a carbon removal project under the Isometric Standard with a 200-year permanence claim, but the available documentation is extremely limited (only a PDD and stakeholder consultation record). Critical verification data—including VVB confirmation of additionality, ERR figures, monitoring results, and buffer pool arrangements—are entirely absent, making it impossible to independently assess the project's integrity or claim safety.
Red Flags
- No VVB verification of additionality found in any available document; the combined test is described but unconfirmed by an independent body
- Zero percent leakage deduction justified only as 'deemed negligible' with no quantified analysis, which is a significant gap for a carbon removal project
- No buffer pool percentage stated despite a 200-year permanence claim; reversal risk is addressed only through SOPs and monitoring language without quantified safeguards
- No ERR figures (ex-ante, claimed, or verified) are available in any document, preventing any assessment of over- or under-crediting
- Only two documents (PDD and stakeholder consultation) are available; no verification report, monitoring report, or third-party audit is present
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test described but no VVB verification found
200-year claim, no buffer pool, reversal prevention via SOPs only
0% deduction, 'deemed negligible' with no quantified analysis
Project-specific, no reassessment date, no measured-vs-modeled info
Grievance mechanism and benefit sharing present; FPIC not confirmed
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.