Drobonso Carbon is a pre-implementation biochar production and storage project under the Isometric standard with a 200-year permanence claim and a lifetime ex-ante estimate of 311 tCO₂e. The project presents a reasonable methodology and no adverse findings, but critical verification gaps remain: no VVB has verified additionality, no buffer pool is documented, and only a PDD is available with no verification or monitoring reports. The project is in an early stage (crediting period begins 2026), which explains some gaps, but the absence of independent verification is a material concern.

Red Flags

  • Additionality test (combined investment/regulatory) is described in the PDD but has not been verified by any VVB; no VVB name appears in the extracted record
  • No buffer pool percentage is stated despite a 200-year permanence claim, leaving reversal risk unmitigated in the documentation
  • Only a single document (PDD) is available; no verification report, monitoring report, or independent audit is present in the record

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Combined test in PDD, unverified by VVB

Permanence

200-yr claim, no reversal events, no buffer pool stated

Leakage

0% deduction with quantified justification

Baseline

Project-specific baseline, not yet reassessed

Safeguards

Grievance mechanism and benefit sharing present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents