Burney Forest Power v1.2
#55of 58 in Biochar#44of 52 in ISO
Audit Analysis
Burney Forest Power is a biochar carbon-removal project under the Isometric standard with a 200-year permanence claim, but the available record consists solely of a PDD with six material findings and four required corrective actions. No verification report, monitoring report, or independent VVB assessment is present, leaving the 2,800-tonne ERR claim unverified and the additionality test unconfirmed by a third party. The project does demonstrate positive safeguards (FPIC, grievance mechanism, benefit sharing) and reports no reversal events, but the documentation and verification gaps are substantial.
Red Flags
- Six material findings in the PDD, including non-compliant sampling, commingled biochar/ash samples, missing contaminant analyses (PCB, PAH, PCDD/F), absent deployment receipts, and no stack monitoring for CH4/N2O
- No independent VVB identified and no verification report available; additionality (combined test) is unverified by a third party
- 200-year permanence claim with no buffer pool percentage stated, leaving no quantified safety margin against reversal
- Only one document (PDD) in the evidence base; no monitoring report, no verified ERR figure, and no CORSIA or CCP eligibility determination
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test stated but no VVB verification found
200-yr claim, no buffer pool, no reversals
0% deduction, 'deemed negligible' justification only
Project-specific, no reassessment date stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →