Humboldt Sawmill Company (HSC)
#32of 58 in Biochar#17of 52 in ISO
Audit Analysis
The Pacific Biochar – Humboldt Sawmill Company project is a biochar carbon-removal project verified by 350Solutions under the Isometric standard. While additionality was confirmed via an investment test and no reversal events were reported, the verification surfaced nine material findings including a $247,000 government grant omitted from the financial additionality model, five environmental and safety violations in the past five years, and a deviation from the protocol-defined sampling procedure. The combination of a project-specific baseline, a 200-year permanence claim supported by only a 2% buffer, and unresolved PDD amendments places meaningful risk on the robustness of the credit claims.
Red Flags
- Five environmental and safety violations by HSC in the last five years, with unresolved Clean Air Act notices still outstanding at the time of verification
- A $247,000 government grant received in 2021 was omitted from the financial additionality model, undermining the investment-test conclusion
- Sampling procedure deviated from Method B requirements (one sample per batch instead of three samples from one selected batch per 10-batch block), compromising MRV reliability
- ERR figures differ by a factor of ~2.4 between the monitoring report (559.25) and the verification report (1,323.09), with no clear reconciliation in the extracted record
- Leakage is deemed negligible with no quantified deduction or detailed justification in the available documents
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB-confirmed but grant omitted from model
200-yr claim, 2% buffer, no reversals
Deemed negligible, no quantified deduction
Project-specific, no reassessment date
Mentioned but no grievance mechanism, 5 violations
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →