Skip to main content
ISOCarbon RemovalGeneral Methodologyv2.1

Project Tapir

ISO-1K1GX4BDK1S0 ↗

#46of 52 in ISO

2.7/ 10
Integrity
3.0
Transparency
1.5
Claim Safety
3.5
Documentation
2.5

Audit Analysis

Project Tapir is a biochar production and storage project under the Isometric standard with a specific methodology (v1.1) and some positive elements such as tested carbon content and documented feedstock sustainability. However, the available record is critically incomplete: no additionality assessment, no baseline method, no buffer pool, no permanence claim, and no verified emission reduction figures are present in the two documents reviewed. The project cannot be meaningfully assessed for over-crediting or permanence risk with the current evidence.

Red Flags

  • No additionality test type or VVB verification found in any available document — a fundamental requirement for any carbon credit project
  • No baseline method stated and no baseline reassessment date recorded, making it impossible to assess whether claimed removals are additional
  • No buffer pool percentage or permanence claim period specified for a biochar project where carbon storage durability is the core value proposition
  • No leakage deduction or justification provided, despite biochar end-use potentially releasing stored carbon
  • No verified or claimed emission reduction figures available in any document, preventing any assessment of over-crediting

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality assessment found

Permanence

Risk score 1, no reversals, but no buffer pool or permanence claim

Leakage

Not addressed; no deduction or justification

Baseline

No baseline method or reassessment date found

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents