Burnsville
Audit Analysis
The Burnsville Landfill Burial Project is a brand-new biochar carbon-removal project (crediting period starting October 2025) with a 1,000-year permanence claim but no buffer pool, a leakage treatment that is contradictory across documents, and a material stakeholder finding questioning whether feedstock replacement avoids leakage into non-renewable energy. Transparency is very limited: no VVB is identified, no ex-ante or verified ERR figures appear in the extracted record, and only two documents (PDD and stakeholder consultation) are available. The project is too early in its lifecycle to assess over- or under-delivery, but the structural gaps in permanence safeguards and leakage quantification warrant caution.
Red Flags
- Leakage treatment is contradictory: the PDD describes it as 'quantified' while the stakeholder consultation record describes it as 'deemed negligible,' and a material finding questions whether feedstock replacement avoids leakage into non-renewable energy production.
- A 1,000-year permanence claim is made with no buffer pool percentage stated in any available document, leaving no quantified safety margin against reversal.
- No VVB name, no ex-ante lifetime ERR estimate, and no verified ERR figure appear in the extracted record, making independent verification of the credit quantity impossible at this stage.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test in PDD but no VVB verification confirmed
1,000-yr claim, low reversal risk, no buffer pool stated
Contradictory treatment; material finding on feedstock substitution
Project-specific baseline; not yet due for reassessment
Grievance mechanism present; FPIC not conducted; benefit sharing not described
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →