The TIRE Project is a biomass geological storage carbon removal project under the Isometric standard, but the available record is extremely sparse. Only a PDD and a stakeholder consultation document were extracted, and nearly all critical integrity indicators—additionality, baseline method, buffer pool, leakage treatment, and permanence safeguards—are absent from the record. No verification body, monitoring data, or verified emission reduction figures are present, making it impossible to confirm the project's claimed 153,035 tCO₂e lifetime removals.
Red Flags
- No additionality assessment or test type is documented for a carbon removal project, leaving the causal link between project activity and emissions reductions unestablished
- No buffer pool percentage or permanence safeguard is stated for a biomass geological storage project, where reversal risk is the central integrity concern
- No leakage deduction or justification is provided despite the project type (biomass storage) presenting inherent leakage pathways
- No verification body (VVB) is identified and no verification or monitoring report is present in the record
- Baseline method is not stated in any available document, making the counterfactual assumption unverifiable
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality assessment found
No buffer pool or permanence safeguard stated
No leakage treatment documented
Baseline method not stated
Grievance mechanism present; FPIC not confirmed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →