Skip to main content
ISOCarbon RemovalGeneral Methodologyv2.1

Charm Bio-oil Geologic Storage

ISO-1HZSSWBQM1S0 ↗

#4of 52 in ISO

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

Charm's bio-oil geologic storage project has VVB-confirmed additionality and no reported reversal events, but the absence of a stated buffer pool, leakage treatment, and baseline method—combined with 14 material findings and 11 corrective actions—indicates a project still maturing operationally. The exact match between claimed and verified removals (764.14 tCO₂e) is reassuring against over-claiming, yet the contradiction with an earlier interim figure of 43.47 tCO₂e and the short one-month monitoring window limit confidence in the MRV record.

Red Flags

  • No buffer pool percentage stated in any available document for a carbon-removal project with a 5-year crediting period, leaving permanence risk unquantified
  • 14 material findings in the verification report, including a bio-oil release at the rail spur with emissions deferred to the next reporting period, and reliance on scale tickets rather than flow meters for injection mass measurement
  • Contradiction in verified ERR: 764.14 tCO₂e (final report, 2026-03-18) versus 43.47 tCO₂e (interim report, 2026-02-23), a 17.6× discrepancy that is not explained in the extracted record
  • Post-closure monitoring plan for the Vaulted Deep storage site has not yet been provided, a critical gap for long-term permanence assurance
  • Leakage deduction and justification are both absent from the extracted record, with no stated treatment for potential displacement or operational emissions

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; post-closure plan pending

Leakage

No deduction or justification found

Baseline

Method not stated in available documents

Safeguards

Grievance mechanism present; FPIC and community engagement documentation incomplete

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents