Project Juniper
Audit Analysis
Project Juniper is an Isometric Direct Air Capture project with a 1,000-year permanence claim and a self-estimated 5% reversal risk, but the available documentation (PDD and stakeholder consultation only) lacks an additionality assessment, baseline method, buffer pool, and any verified emission reduction figures. The project shows positive signals in renewable energy use, carbon content testing, and LCA inclusion, yet the absence of independent verification and quantified claims leaves critical integrity and transparency gaps unresolved.
Red Flags
- No additionality test type or VVB verification is documented in the PDD or stakeholder consultation record, leaving the project's additionality unassessed.
- No buffer pool percentage is stated despite a 1,000-year permanence claim and a self-estimated 5% reversal risk over that period.
- No leakage deduction or justification is provided in any available document.
- No claimed or verified emission reduction figures are present, making over- or under-crediting assessment impossible.
- No VVB is identified and no verification or monitoring report is included in the evidence set.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification documented
1,000-yr claim with self-estimated 5% reversal, no buffer pool
No leakage deduction or justification stated
Baseline method not stated in available documents
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not documented
CORSIA and CCP status not stated; dual-channel risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →