Grid emission factor: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-CDR-DAC-ERW-GRID-EF
ISOMETRIC-DAC — Direct Air Capture
About this methodology
Carbon dioxide is captured directly from the air and stored by physical or chemical trapping for more than 1,000 years. The protocol sets how to calculate the net carbon dioxide removed from the atmosphere.
- Issued by
- Isometric · issuer's site
- Version
- 1.3 · source ·
- Climate outcome
- CO2 removals
- Activity
- Direct air capture
- ICVCM Core Carbon Principles
- Approved by the ICVCM for Isometric, version(s) 1.1 (source) ·
- Official page
- registry.isometric.com
Approval applies to the programs and versions listed. The official decision and project-specific conditions must also be met for credits to carry a CCP label; this is not a label for the projects on this page.
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
- shown
Sustainability of the feedstock: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. CM-F-CDR-DAC-ERW-FEEDSTOCK-SUSTAINABILITY
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Where carbon is stored: the permanence start P-START
CarbonMeld scores permanence only for projects that store carbon. Forest projects start from CCQI's grade of the programme on criterion 3.2. CCQI grades this criterion by programme, so its grade applies to every methodology of the programme. Where CCQI does not grade the programme, permanence starts at the neutral 5.0: the CDM's grade does not stand in for another programme's approach to permanence. Direct air capture with storage, biogenic emissions capture with storage, other geological storage and biochar start at the top, 8.0. The EU classes these types as permanent carbon removals. Enhanced weathering also starts at 8.0. It shares a family with direct air capture. This start is our own judgement. Concrete carbonation, ocean alkalinity, buried biomass and long-lived materials start at the neutral 5.0. These types have no class in a public source.
Forests: CCQI's grade of the programme.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it (ISO-ERW v1.2 §8.5.4, p. 1). Our current method does not assess it. CM-F-CDR-DAC-ERW-LEAKAGE
- not assessed
Buffer pool: the methodology sets rules for it in some cases (ISO-ERW v1.2 §9.2, p. 1). Our current method does not assess it. CM-F-CDR-DAC-ERW-BUFFER
- not assessed
No legal requirement for the activity: the methodology sets rules for it (Puro ERW 2022 §3.2.2, p. 20). Our current method does not assess it. CM-F-CDR-DAC-ERW-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): the methodology sets rules for it (Isometric Direct Air Capture v1.3 §5; Isometric Enhanced Weathering in Agriculture v1.3 §5; Puro ERW Edition 2025 v.2 §4.4, p. 50). Our current method does not assess it. CM-F-CDR-DAC-ERW-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
Projects using ISOMETRIC-DAC
Browse 2 published projects using ISOMETRIC-DAC, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under ISOMETRIC-DAC?
In CarbonMeld's data, ISOMETRIC-DAC projects are on one registry: Isometric (2 projects, 1 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Isometric | 2 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
