ZX-24 Vulkaneifel
Audit Analysis
The ZeroEx Enhanced Rock Weathering project in Vulkaneifel has a VVB-confirmed additionality assessment and no reported reversal events, but the validation report surfaced five unresolved points of concern questioning the core methodology (soil representativeness, cation-uptake deductions, resin longevity, and measurement feasibility). The absence of a buffer pool, a project-specific baseline, and any quantified leakage deduction in the extracted record, combined with a 1,000-year permanence claim, leaves material integrity and claim-safety gaps. The project is still in its validation stage with no monitoring or verification data available.
Red Flags
- Five material findings (PC1–PC5) in the validation report question soil representativeness, the appropriateness of a flat cation-uptake deduction across 30 cropping systems, data support for reduced deductions for deep-rooted crops, resin longevity under repeated installation/removal, and the feasibility of measuring secondary clay-mineral precipitation via XRD.
- No buffer pool percentage is stated in any available document despite a 1,000-year permanence claim for a carbon-removal project.
- Leakage justification is described as 'quantified' in the validation report, yet no actual deduction percentage appears in the extracted record.
- Three corrective actions remain open, including a required correction to the loading/unloading emissions calculation method before future verifications.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
VVB-confirmed combined test
1,000-yr claim, no buffer pool stated
Described as quantified but no % in record
Project-specific, no reassessment timing
Grievance & benefit-sharing present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →