Leakage: the methodology sets rules for it (VM0051 v1.1 leakage, p. 34). CarbonMeld reads it in the project's documents. CM-F-VM0051-LEAKAGE
VM0051 — Improved Management in Rice Production Systems
About this methodology
Projects improve water and crop management in flooded rice fields. The method measures greenhouse gas reductions from the changed cultivation practices against baseline rice production.
- Issued by
- Verra (VCS) · issuer's site
- Version
- 1.1 · source ·
- Status
- Active at Verra / Verified Carbon Standard · source ·
- Climate outcome
- Emission reductions
- Activity
- Agricultural land
- ICVCM Core Carbon Principles
- Approved by the ICVCM for Verified Carbon Standard, version(s) 1.1 (source) ·
- Official page
- verra.org ·
Approval applies to the programs and versions listed. The official decision and project-specific conditions must also be met for credits to carry a CCP label; this is not a label for the projects on this page.
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Set by the methodology or the programme, not assessed by our current method
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-VM0051-SAFEGUARDS-FPIC
A methane activity the law requires A-LEGAL
The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
-
v1.1active from 14 Jul 2026currentsource
Updated to follow the VCS Methodology Template, v5.0 Updated references to VCS Version 5 Updated sectoral scope from 14: AFOLU to 15: Agriculture Updated requirement for baseline reassessment every five years or at project crediting …
-
v1.0active from 27 Feb 2025 – 1 Aug 2027source
Projects using VM0051
Browse 15 published projects using VM0051, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under VM0051?
In CarbonMeld's data, VM0051 projects are on one registry: Verra (15 projects, 1 registered).
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 15 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (20 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
