Buffer pool: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. It does not apply to CDM projects. Our current method never counts it as a gap for them. At the listing stage (under development), Verra asks a draft project description without its non-permanence risk section (Verra, «Registration and Issuance Process» v4.6, 16 Oct 2024, §3.1.3, p7). CarbonMeld then adds no buffer flag. CM-F-ARR-BUFFER
AR-AMS0007 — Afforestation and reforestation project activities implemented on lands other than wetlands
About this methodology
Small projects establish or restore forests on land outside wetlands, including grasslands, croplands or settlements. The method measures net CO2 removal through changes in carbon stocks.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 3.1 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- CO2 removals
- Activity
- Forestry
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (45 projects)
- International Carbon Registry (ICR) (2 projects)
- Global Carbon Registry (GCR) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Leakage not addressed (forest and land) Q-LEAKAGE-NOT-ADDRESSED
Forest, wetland, peat, grassland and soil carbon: the documents read do not address leakage. Outside REDD+ and reforestation, the rule applies only where the methodology requires a leakage assessment. At the listing stage, the rule does not apply if the programme's listing form has no section on leakage. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Where carbon is stored: the permanence start P-START
CarbonMeld scores permanence only for projects that store carbon. Forest projects start from CCQI's grade of the programme on criterion 3.2. CCQI grades this criterion by programme, so its grade applies to every methodology of the programme. Where CCQI does not grade the programme, permanence starts at the neutral 5.0: the CDM's grade does not stand in for another programme's approach to permanence. Direct air capture with storage, biogenic emissions capture with storage, other geological storage and biochar start at the top, 8.0. The EU classes these types as permanent carbon removals. Enhanced weathering also starts at 8.0. It shares a family with direct air capture. This start is our own judgement. Concrete carbonation, ocean alkalinity, buried biomass and long-lived materials start at the neutral 5.0. These types have no class in a public source.
Forests: CCQI's grade of the programme.
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it in some cases (VM0047 §7, p. 13). Our current method does not assess it. CM-F-ARR-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology (GS LUF v1.2.1, p. 14). Our current method does not assess it. CM-F-ARR-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Transition to VM0047
VCS Methodology VM0047 Afforestation, Reforestation, and Revegetation will replace these two CDM methodologies
source ·
Dates and conditions (1)
- New VCS projects that had not requested listing as under validation by 28 December 2023 must use VM0047; projects already in validation with AR-ACM0003 or AR-AMS0007 had to complete it by 30 June 2025. source ·
Merges AR-AMS0001 · AR-AMS0002 · AR-AMS0004 · AR-AMS0005 · AR-AMS0006
source: AR-AMS0001 · AR-AMS0002 · AR-AMS0004 · AR-AMS0005 · AR-AMS0006
All 4 versions
-
v03.1adopted 24 Jul 2015source
Minor revision to remove the use of a tool under Normative References and other editorial improvements.
-
v03.0adopted 4 Oct 2013source
This revision: Allows projects to use approved standardized baselines when applicable; Uses a revised template and thus enhances readability and consistency; Changes the title from “AR-AMS0007: Simplified baseline and monitoring …
-
v02.0.0adopted 20 Jul 2012source
-
v01adopted 17 Sept 2010source
Initial adoption.
Projects using AR-AMS0007
Browse 59 published projects using AR-AMS0007, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.
Which registries list projects under AR-AMS0007?
In CarbonMeld's data, AR-AMS0007 projects are on 4 registries: Verra (45), CDM (11) and International Carbon Registry (2), and 1 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 45 | 19 | See the list |
| CDM (UNFCCC) | 11 | 10 | See the list |
| International Carbon Registry (ICR) | 2 | 0 | See the list |
| Global Carbon Registry (GCR) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (13 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
3 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages show the analysis.
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Not yet assessable
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Not registered
- Analysis: Not registered
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Not yet assessable
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: Not registered
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Rated
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Small scale Obra JFM A/R CDM Project on degraded lands in Obra Forest Division, Uttar Pradesh, IndiaAnalysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No public grade applies yet
- Analysis: No rating yet
- Analysis: Not yet assessable
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: No rating yet
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: Re-assessment pending
- Analysis: No public grade applies yet
- Analysis: No rating yet